
ARW
120-Day Re-Assessment Plan
Table 1.1 Service Standard Levels
Table 1.1 Evaluation Methodologies: Purpose and Site Locations
Table 3.2.1 Analysis of Observations for Augmentation/Backup Sites
Table 3.3.1 Comparison of ASOS to Longline Dissemination Sites
Table 3.3.2 Raw Data for Comparison of ASOS to Longline Dissemination
Table 3.4.1 Blind Comparison of Automated and Manual Observations Sites
Table 3.4.2 Criteria Used for Data Comparison
Table 3.5-1 Pre-Commissioning Process Data Analysis Sites
Table 3.5-2 Pre-Commissioning Data Evaluation Elements
Table 3.6-1 ASOS Sensors Mean Time Between Failure Sites
Table 3.6-2 Statistical Data for All Failures
Table 3.7-1 Responsiveness To Changing Conditions Sites