Capstone Program
Phase 1:
Yukon Kuskokwim Delta
General Phase 1 Information
- Capstone Phase I Overview (PDF)
- External Link: View a Capstone Installation
- Frequently Asked Phase 1 Questions (2005)
- TIS-B Training (PDF)
Reports
- Y-K Delta Service Area Map (PDF)
- 2005 Impact of Capstone Phase 1 - Final Report (PDF, 1.37 MB)
- 2005 Impact of Capstone Phase 1 - Post Transitional Annual Report (PDF, 1.37 MB)
- UAA 2004 Summary Report (PDF)
- UAA 2003 Summary Report (PDF)
- UAA 2002 Safety Study (PDF, 1.19 MB)
- UAA 2002 Safety Study - Executive Summary (PDF)
- UAA 2001 Safety Study (PDF)
- UAA 2001 Safety Study - Executive Summary (PDF)
- UAA Phase 1 Baseline Report (PDF, 1.70 MB)
- MITRE 2000 - 2002 Interim Assessment (PDF)
- MITRE 2000 - 2001 Interim Assessment (PDF)
- Flight Standards AK Region (AAL240) Report on Phase 1 Implementation (PDF)
- System Safety Evaluation, Capstone Phase I Implementation (PDF)
- System Safety Evaluation, Capstone Phase II Implementation (PDF)
- Cessna 208 De-icing Evaluation Interim Report (PDF)
- A Review of Accidents Involving Alaskan Air Taxi Commercial Flight Operations 1983 to 2000 (PDF)

