Capstone Program
Phase 2:
Southeast Alaska
General Phase 2 Information
- Capstone Phase II Overview (PDF)
- External Link: Installation photos of first prototype Chelton system
- Frequently Asked Phase 2 Questions (2005)
Reports
- Phase II Full Report (PDF, 1.37 MB)
- Phase II Summary Report (PDF)
- July 2005 Final Summary 2004 Phase II Report (PDF, 1.17 MB)
- UAA 2003 Summary (PDF, 1.88 MB)
- UAA Baseline Report (PDF)
- Prelimary Hazard Status Report (PDF)
- UAT GBT Specification (PDF, 1.63 MB)
- RNAV Test and Evaluation Master Plan (PDF, 8.47 MB)
- Install Plan (PDF)
- SFAR 97 (PDF)

