NY Metro Airports

NY Metro Airports (Activities)
NY/NJ/PHL Airspace Redesign11/03/2011 -
Project InitiativeDescriptionStatus StartFinish
Stage 3 and 4 Design Design, model, and validate for implementation. Stage 3: South Gate and East Gate. Stage 4: North Gate and final West Gate realignment. Airspace Redesign is now paused until further notice. Dates are now TBD. 11/03/2011 A TBD
Stage 3 Implementation South Gate and East Gate realignment Airspace Redesign is now paused until further notice. Dates are now TBD.   TBD
Develop RNAV Route for DCA and BWI Traffic to segregate from BIGGY Develop a separate Area Navigation (RNAV) route to segregate traffic to Ronald Reagan Washington National (DCA) / Baltimore-Washington International (BWI) from the NY and PHL traffic. Airspace Redesign is now paused until further notice. Dates are now TBD.   TBD
Add 3rd Northgate route Add additional route for Chicago O'Hare (ORD) and Detroit/Wayne International (DTW) traffic to allow other unrestricted destinations to flow freely on existing routes. Airspace Redesign is now paused until further notice. Dates are now TBD.   TBD
Stage 4 Implementation North Gate and final West Gate realignment; Complete Airspace Integration. Airspace Redesign is now paused until further notice. Dates are now TBD.   TBD
A = Actual Date

This action plan is intended to establish a climate of accountability for the FAA, airports, and airlines. No project will be implemented prior to the completion of all required analysis, reviews and approvals. The information provided is for planning purposes only. For actual Runway and Taxiway Closures, and Equipment Outages, please review current Notices to Airmen (NOTAMs).