OEP V1.0 Solution Set Smart Sheets
The content of OEP Version 1.0 is presented in 10 Solution Sets.
Solution Sets Smart Sheets Layout

- Initiate Trajectory-Based Operation (TBO)
- Increase Arrivals/Departures at High Density Airports (HiDensity)
- Increase Flexibility in the Terminal Environment (FlexTerm)
- Improve Collaborative Air Traffic Management (CATM)
- Reduce Weather Impact (Weather)
- Increase Safety, Security, and
Environmental Performance (SSE)
- Transform Facilities (Facilities)
- Aircraft & Operator Requirements (Avionics)
- OEP 35 Airports (OEP 35)
- OEP Metro Areas (OEP Metro)
____________________________________________
Solution Set Smart Sheet Layout
All the images and tables within the
Solution Set Smart Sheets may be enlarged by 'clicking' directly onto the item for better veiwing. Each OEP Solution Smart Sheet includes the following sections:
Summary Description | Background | Operational Capability Description
Timeline | Benefits | Dependencies | FY08 Activities
Summary Description: Defines the scope of the Solution Set.
Background: Describes the problems in the current air traffic control system that this Solution Set aims to resolve.
Operational Capability Description: Defines the near-term commitments and mid-term operational capabilities. The mid-term is defined as 2012-2018.
Timeline: Near-term commitments are shown as triangles. Commitments are fully-funded program activities with well-defined implementation dates. Operational capabilities are shown as rectangles. These dates are strategic; the capability is expected to begin somewhere within the timeframe represented by the rectangle. Future OEP versions will define more specific implementation dates for these capabilities.
Benefits: Provides a qualitative assessment of benefits.
Dependencies: Identifies key technologies, programs, avionics, policies or other considerations on which the success of this Solution Set hinges.
FY08 Activities: Details activities including research, demonstrations, and other programmatic activities that are part of the FY08 capital investment plan and are relevant to this Solution Set .