GNSS - GPS/WAAS Approaches
The availability of Wide Area Augmentation System (WAAS)-capable approach procedures is a significant enabler of WAAS benefits in the United States. This page provides the latest status of these U.S. WAAS approach procedures.
As of April 4, 2013, there are 3,100 new Wide Area Augmentation System (WAAS) Localizer Performance with Vertical guidance (LPV) approach procedures.
Currently, there are also 414 Localizer Performance (LP) approach procedures in the U.S.
You may subscribe to this page, by selecting the Subscribe link at the top of this page.
To find out if there is a Global Positioning System (GPS) or WAAS-enabled approach at an airport where you fly, please see the links in the page below.
For information about LPVs and LPs in the U.S., please see links below.
See complete list of all published LPVs in the U.S.
See complete list of all published LPs in the U.S.
For more information about LPVs in Canada (enabled by WAAS) and in Europe (enabled by EGNOS), please see links below.
Canada - Information about Canadian LPVs can be found in the related article on the WAAS News page.
Europe - Information about EGNOS and Europe's LPV plans can be found on the European Satellite Services Provider (ESSP) website. A current list of European LPVs can be viewed from the ESSP main page by selecting the link near the bottom of this page called - See the full list of actual Airports with EGNOS-based procedures.
Select the date below to see the latest U.S. LPV procedures published:
April 4, 2013
| LPV Procedure Locations for the Continental U.S. (updated November 2012) (Click images for bigger pictures) | |
| LP Procedure Locations for the Continental U.S. (updated November 2012) (Click images for bigger pictures) | |
Procedures (Part 139 Airports) |
Procedures (Non-Part 139 Airports) |
Total
Number of Procedures |
|
|---|---|---|---|
LNAV
Procedures |
1,780 |
3,869 |
5,649 |
LNAV/VNAV
Procedures |
1,317 |
1,666 |
2,983 |
LPV
Procedures |
1,322 |
1,778 |
3,100 |
LPVs w/ 200' HAT |
784 |
||
LP Procedures |
57 |
357 |
414 |
GPS Stand-Alone Procedures |
16 |
159 |
175 |
Part
139 Airports Served
|
Non-Part 139 Airports Served |
Total
Airports* (with WAAS-capable Procedures - GPS, LNAV, LNAV/VNAV, and/or LPV) |
|
|---|---|---|---|
LNAV Procedures |
540 |
2,052 |
2,592 |
LNAV/VNAV Procedures |
465 |
992 |
1,457 |
LPV Procedures |
487 |
1,066 |
1,553 |
LP Procedures |
44 |
256 |
300 |
GPS Standalone Approaches |
14 |
119 |
133 |
GPS
LNAV
LNAV/VNAV
LP
LPV
RNP
ALL
Update effective:
April 4, 2013
Publication Dates for New Procedures
New procedures are published for use in the National Airspace System (NAS) every 56 days through the Terminal Procedures Publication (TPP) process. However, procedures can also be published during the interim months through the Operations Change Notice (OCN) process. Corresponding dates for 2013 are:
Data on this page, including the attached spreadsheets, is derived from National Aeronautical Charting Office (NACO) Flight Information Publications. Data is for informational purposes only and should NOT be used as official information in any capacity related to flight operations. For official information, please consult the current Flight Information Publications.
Link to FAA’s Instrument Flight Procedures (IFP) Production Plan web page. This page contains information on projected IFP production by region or fiscal year.
Link to the FAA's digital - Terminal Procedures Publication (d -TPP)/Airport Diagrams web page. This page provides the ability to search, view, and download all U.S. Terminal Procedure Publications (TPPs) in PDF format.
Page Last Modified: 04/02/13 10:55 EDT
This page can be viewed online at: http://www.faa.gov/about/office_org/headquarters_offices/ato/service_units/techops/navservices/gnss/approaches/