Orders

Number Title Effective Date Associated Memorandums Memo Date
7130.3A Holding Pattern Criteria 03/18/98 Interim Guidance for Evaluating Area Navigation (RNAV) Holding Patterns (PDF)

Application of Short Take Off Landing (STOL) Holding Pattern Criteria (PDF)

Policy on Use of 175 Knots Indicated Airspeed (KIAS) Holding Pattern (PDF)

Interim Guidance for GPS Holding Leg Length (PDF)
06/17/04



12/06/04


07/07/05


11/27/06
7910.5C Aeronautical Charting Forum 09/14/12
8260.3B CHG 1-26 United States Standard for Terminal Instrument Procedures (TERPS) (Consolidated version with all current changes) 02/24/11 Instrument Departure Criteria in Terminal Procedures 903 (PDF)

Directive Feedback Information Order 8260.3B (TERPS), TERPS Control 03-01 (PDF)

Automated Precipitous Terrain Adjustments (PDF)

Clarification of Intent of FAA Order 8260.3B, United States Standard for Terminal Instrument Procedures (TERPS), Volume 1, Paragraph 1720 (PDF)

Continuous Descent Angle on Instrument Procedures (PDF)

Localizer Directional Aid (LDA) with Glide Slope Procedure Construction Criteria (PDF)

Clarification of Order 8260.3B, United States Standard for Terminal Instrument Procedures (TERPS), Paragraph 1750d (PDF)

Clarification of Remote Altimeter Setting Source (RASS) Application to Missed Approach Surface Elevations (PDF)

United States Standard for Locating the Precise Final Approach Fix (PFAF, FAF) On Instrument Approach Procedures and Locating Fixes for Air Traffic Control (ATC) Vertical Separation Purposes (PDF)

Interim Criteria for Precision Approach Obstacle Assessment and Category II/III Instrument Landing System (ILS) Requirements (PDF)

Standard Threshold Crossing Height (TCH) Values (PDF)

Temporary Waivers to FAA Order 8260.3B, United States Standard for Terminal Instrument Procedures (TERPS), Volume 1, Chapter 3, Paragraph 3.3.2c (PDF)

Waiver to FAA Order 8260.3B, United States Standard for Terminal Instrument Procedures (TERPS), Volume 1, Chapter 3, Paragraph 3.3.2c(1)(b) (PDF)

Publish Touchdown Zone Elevation (TDZE) on Instrument Approach Charts (PDF)
09/05/03


12/04/03



06/18/04


03/08/07





03/30/07


08/28/08



12/08/08




11/16/10




02/09/11






08/16/11




12/29/11


09/04/13





10/30/13





01/08/14
8260.4 ILS Obstacle Risk Analysis 11/25/86
8260.15E United States Army Terminal Instrument Procedures Service 02/02/07
8260.19F Flight Procedures and Airspace (Consolidated version with all current changes) 01/09/14 Clarification of Remote Altimeter Setting Source (RASS) Application to Missed Approach Surface Elevations (PDF)

Instrument Flight Procedure (IFP) Periodic Review Requirements Revised (PDF)
11/16/10




01/28/14
8260.23 Calculation of Radio Altimeter Height 07/09/71
8260.26F Establishing Submission Cutoff Dates for Civil Instrument Flight Procedures 03/31/14
8260.32E U.S. Air Force Terminal Instrument Procedures Service 09/02/11
8260.42B CHG 1 United States Standard for Helicopter Area Navigation (RNAV) 11/20/12 Remote Altimeter Setting Source (RASS) Adjustment and Notice to Airmen (NOTAM) Association with Helicopter Point-in-Space (Pins) and Instrument Flight Rules (IFR) to a Visual Flight Rules (VRF) Heliport (IVH) Instrument Approach Procedure (IAP) (PDF)

Updated Criteria for Airship Area Navigation (RNAV) Approach Procedures (PDF)
11/14/06








12/30/09
8260.46E Departure Procedure (DP) Program 05/30/14 Top Altitude Interim Guidance (PDF) 09/26/14
8260.49A CHG 1 Simultaneous Offset Instrument Approach (SOIA) 11/09/12
8260.53 Standard Instrument Departures That Use RADAR Vectors To Join RNAV Routes 07/25/05
– 8260.58
– 8260.58 (with Calculators) (PDF)
United States Standard for Performance Based Navigation (PBN) Instrument Procedure Design
09/21/12 Automated Precipitous Terrain Adjustments (PDF)

Updated Criteria for Airship Area Navigation (RNAV) Approach Procedures (PDF)

United States Standard for Locating the Precise Final Approach Fix (PFAF, FAF) On Instrument Approach Procedures and Locating Fixes for Air Traffic Control (ATC) Vertical Separation Purposes (PDF)

Standard Threshold Crossing Height (TCH) Values (PDF)

Required Navigation Performance (RNP) 1 Departure Procedures (DP) (PDF)

Clarification to Order 8260.58, United States Standard for Performance Based Navigation (PBN) Instrument Procedure Design (PDF)

Use of NAVAIDs in RNP AR Instrument Flight Procedure Design (PDF)

Clarification of Order 8260.58, US Standard for Performance Based Navigation (PBN) Instrument Procedure Design, policy relative to Heading to Altitude (VA) followed by Direct to Fix (DF) legs (PDF)

Publish Touchdown Zone Elevation (TDZE) on Instrument Approach Charts (PDF)

Waivers to FAA Order 8260.58, U.S. Standard for Performance Based Navigation (PBN) on Required Navigation Performance (RNP) Value Changes. RNP Visual Obstacle Identification Surface (OIS), Minimum Radius-to-Fix (RF) Segment Length and Terminal Arrival Area (TAA) Turn Calculation Assumptions (PDF)
06/18/04


12/30/09



02/09/11






12/29/11


01/12/12



03/01/13




04/24/13



11/04/13






01/08/14



08/04/14
8260.59 United States-Instrument Flight Procedures Panel (US-IFPP) 01/28/13

Advisory Circulars (ACs)

Number Title Effective Date Associated Memorandums Memo Date
AC 90-80B Approval of Offshore Standard Approach Procedures (OASP), Airborne Radar Approaches (ARA), and Helicopter En Route Descent Areas (HEDA) 04/12/92

Notices

Number Title Effective Date Associated Memorandums Memo Date
8260.74 Special Authorization (SA) Category (CAT) I Instrument Landing System (ILS) Missed Approach Procedure Evaluation and Documentation Requirements 06/19/14