EXPLANATION OF CHANGES
Direct questions through appropriate facility/service center
to the office of primary responsibility (OPR)
Effective: September 25, 2008
a. 1-1-6. EFFECTIVE DATE
This change establishes a new effective date for the
NOTAM order. This change cancels and incorporates
N JO 7930.85, Notice to Airmen (NOTAM), effective
January 28, 2008.
b. 1-2-1. POLICY
This change establishes the policy for the NOTAM order.
This change cancels and incorporates N JO 7930.85,
Notice to Airmen (NOTAM), effective January 28, 2008.
c. 1-3-1. AIR TRAFFIC;
2-1-3. PUBLICATION CRITERIA;
2-2-1. NOTAM CLASSIFICATION;
2-2-3. LOCAL DISSEMINATION;
3-1-3. NOTAM LOGS;
3-3-1. USE OF CONTRACTIONS AND
ABBREVIATIONS;
3-3-2. EXPRESSION OF TIME IN THE NOTAM
SYSTEM;
3-3-3. RUNWAY IDENTIFICATION;
3-3-4. TAXIWAY IDENTIFICATION;
4-1-2. NATIONAL NOTAM OFFICE
RELATIONSHIPS;
4-2-1. NOTAM COMPOSITION;
4-3-3. NOTAM TRANSMISSSION;
4-3-5. CONFIRMING ACCEPTANCE BY THE
NOTAM SYSTEM;
4-4-3. CANCELING PUBLISHED NOTAM DATA;
4-5-2. NOTAM SERVICE MESSAGES;
5-1-1. ORIGINATORS OF MOVEMENT AREA
NOTAMs;
5-1-2. HANDLING REPORTED MOVEMENT
AREA CONDITIONS;
5-1-3. NOTAM (D) MOVEMENT AREA
INFORMATION;
5-1-4. REPORTING OF SNOW, ICE, SLUSH, AND
WATER CONDITIONS;
5-1-5. CERTIFICATED AIRPORT AIRCRAFT
RESCUE AND FIRE FIGHTING (ARFF);
5-1-6. CONTINUOUS SNOW REMOVAL
OPERATIONS ON MULTIPLE RUNWAYS;
5-1-7. NOTAM (L) MOVEMENT AREA
INFORMATION;
5-2-1. GENERAL;
5-2-2. NOTAM (D) LIGHTING AIDS;
5-2-3. NOTAM (L) LIGHTING AIDS;
5-3-1. GENERAL;
5-3-6. CATEGORY 2 AND 3 INSTRUMENT
LANDING SYSTEM STATUS;
5-3-7. NOTAM (D) NAVAID;
5-3-8. HOURS OF OPERATION;
5-4-3. NOTAM (D) COMMUNICATIONS
OUTLETS;
5-5-1. GENERAL;
5-5-2. NOTAM (D) SERVICES;
5-5-3. HOURS OF OPERATION;
5-5-4. FUEL UNAVAILABILITY;
6-1-1. NOTAM (D) WEATHER AND WEATHER
REPORTING EQUIPMENT;
6-1-2. LOW LEVEL WINDSHEAR ALERT
SYSTEM (LLWAS);
6-1-3. RUNWAY VISUAL RANGE;
6-1-4. TERMINAL DOPPLER WEATHER RADAR
(TDWR);
6-2-1. FORMATTING AIRSPACE NOTAM (D)s;
6-2-2. NOTAM (D) HOURS OF OPERATION
SURFACE AREAS;
6-2-3. RESTRICTED AREAS;
6-2-4. AIRSPACE AND ALTITUDE
RESERVATIONS;
6-2-5. AIRCRAFT OPERATIONS;
6-2-6. AERIAL REFUELING;
6-2-7. PARACHUTE JUMPING/SKY DIVING
(PJE);
6-2-8. DEPARTURE PROCEDURES AND
STANDARD TERMINAL ARRIVALS;
6-2-9. MOORED BALLOONS, KITES,
UNMANNED ROCKETS, UNMANNED FREE
BALLOONS, HOT AIR BALLOONS, AND HIBAL;
and
6-2-10. LIGHTS OUT/NIGHT VISION GOGGLE
(NVG) OPERATIONS IN MILITARY
OPERATIONS AREAS
This change sets the policy of putting the keyword prefix
in front of any NOTAM information being sent in to
become a NOTAM.
d. Appendix 5. Approved NOTAM Contractions
Appendix 5 has been deleted because of redundancy.
Readers should refer to FAAO JO 7340.2, Contractions. Appendix 6, FCC Field Office Fax Numbers, is
subsequently renumbered as appendix 5.
e. Entire manual.
Editorial/format changes made throughout the order.
|