Metroplexes at a Glance
Metroplex Daily Average by Fiscal Year Projected Annual Benefits
2014 Total Operations 2014 Scheduled Flights Fuel Savings (Gallons of fuel in millions) Value of Fuel Savings (Fuel costs in millions) Carbon Savings (Metric tons of carbon in thousands) Metroplex Phase
Atlanta 3,097 2,329 2.2 $6.3 18.8 Implementation
Charlotte 2,636 2,026 3.3 $9.4 28.0 Implementation
Cleveland-Detroit 2,341 1,435 3.4 $9.7 28.9 Evaluation
D.C. 2,760 2,001 2.1 $6.1 18.2 Post Implementation
Denver 2,757 1,530 0.6 $1.8 5.4 Design
Houston 2,609 1,615 1.8 $5.3 15.7 Complete
Las Vegas 2,044 859 2.6 $7.5 24.8 Design
North Texas 4,046 2,080 2.6 $7.5 22.4 Complete
Northern California 3,220 1,824 1.3 $3.7 11.0 Post Implementation
Phoenix 1,796 1,049 1.4 $3.9 11.6 Evaluation
South Central Florida 6,735 2,602 5.4 $15.5 46.1 Design
Southern California 5,897 2,557 2.7 $7.8 23.3 Evaluation

Study Team benefits reflect early notional concepts. Design Team benefits reflect estimates based on more mature designs. Post Implementation benefits reflect estimates after procedures are published and in use.