Federal Aviation Administration

AC 90-98 (Cancelled) - Simultaneous Closely Spaced Parallel Operations Airports Using Precision Runway Monitor Systems (PRM)

Document Information

90-98 - Simultaneous Closely Spaced Parallel Operations Airports Using Precision Runway Monitor Systems (PRM) (Cancelled)

Cancelled By
90-98
Date Cancelled
October 06, 2003
Date Issued
February 28, 2003
Responsible Office
AFS-5

Page Last Modified: 06/17/10 15:21 EDT

This page can be viewed online at: http://www.faa.gov/regulations_policies/advisory_circulars/