« Back to Orders & Notices Main Page

Notices

326350 of 377 results.

Export to MS Excel

Orders and Notices Search Results
Number Office Title Date
JO 6550.16 AJW-178 Interim Maintenance Procedures for the System Wide Information Management (SWIM) Terminal Data Distribution System (STDDS) Equipment 06-07-2013
JO 6600.62 AJW-178 Interim Notice to Add APX 7500 Consolette Procedures to Order JO 6600.31 NRCS VHF/FM Maintenance Handbook 04-25-2013
JO 6650.52 AJW-178 Interim Notice for Fujitsu Flashwave 4100 and Flashwave 4020/4010 02-14-2013
JO 6540.45 AJW-178 Interim LDRCL Battery and Rectifier Information 12-03-2012
JO 6600.61 AJW-178 Interim Notice to Add Aeroflex 3920 Test Equipment to Order JO 6600.31 NRCS VHF/FM Maintenance Handbook 11-09-2012
JO 6540.44 AJW-178 Interim Maintenance Requirements for the LEDR 900S Radio Equipment 11-05-2012
JO 6540.43 AJW-178 Notice of Intent for Revision of Order JO 6540.5A, Maintenance of Radio Communications Link (RCL) Systems 08-20-2012
JO 6000.229 AJW-178 Guidance for Release of JO 6000.204, Maintenance of NAS Telecommunications and References to Canceled Handbooks (JO 6000.22B, 6000.47A, 6000.200) 06-29-2012
JO 6000.228 AJW-178 Transition of Bandwidth Manager to the Logistics Center 05-24-2012
JO 6550.14 AJW-178 Interim Maintenance Procedures for the System Wide Information Management (SWIM) Terminal Data Distribution System (STDDS) Equipment 04-30-2012
JO 6650.50 AJW-178 Interim Support Plan (ISP) for Nortel/Ciena FOTS Solution 04-06-2012
JO 6882.23 AJW-192 Interim Guidance on HDH and SZP Site Verification Procedures 01-22-2013
JO 6882.22 AJW-192 Interim Maintenance Task Guidance on Addition of AMR (PRN 133) 09-27-2012
JO 6882.21 AJW-192 GPS Flex Power Impact on WAAS 04-12-2012
JO 6980.143A AJW-223 Notice of Intent for Revision of Order JO6980.29A, Maintenance of Static Uninterruptible Power Supply (UPS) Systems 09-29-2014
JO 6470.54 AJW-223 INTERIM CLARIFICATION PARAMETERS FOR ORDER JO 6470.5A 07-08-2014
JO 6950.43 AJW-223 Interim Guidance to Order JO 6950.22A Maintenance Of Electrical Power Cables 07-02-2014
JO 6950.44 AJW-223 Interim Guidance to Order JO 6950.22A Maintenance Of Electrical Power Cables 07-02-2014
JO 6950.46A AJW-223 Interim Guidance to Order JO 6950.17B Maintenance of Electrical Systems in Buildings 07-02-2014
JO 6950.45 AJW-223 Interim Guidance to Order JO 6950.22A Maintenance Of Electrical Power Cables 07-02-2014
JO 6980.142 AJW-223 Discontinue Use and Dispose of Essex Loadbanks 06-27-2014
JO 6980.140A AJW-223 Notice of Intent for New Maintenance Handbook Order JO 6980.34 05-05-2014
JO 6980.141 AJW-223 Critcal Power Distribution System (CPDS) for ATL Atlanta ATCT Facility Draft Technical Instruction Manual 04-14-2014
JO 6470.53 AJW-223 Interim Guidelines for Standards, Tolerances, and Maintenance of Air Route Traffic Control Center (ARTCC) Critical Essential Power System (ACEPS) Type II 02-06-2014
JO 6980.139 AJW-223 Air Route Traffic Control Center (ARTCC) Critical Essential Power System (ACEPS) Type II Phase I Installation Interim Documentation 02-04-2014

326350 of 377 results.

Export to MS Excel