« Back to Orders & Notices Main Page

Notices

76100 of 379 results.

Export to MS Excel

Orders and Notices Search Results
Number Office Title Date
JO 6330.87 AJW-148 Interim Procedures to Update Safety Logic Alert Check 11-19-2012
JO 6330.88 AJW-148 Interim Requirement for Microprocessor Battery Replacement 12-14-2012
JO 6330.90 AJW-148 Interim Procedure for Power Supply/Modulator Setup on ASDE-X with SMR-3 01-02-2013
JO 6330.91 AJW-148 Interim Maintenance Procedures for IF Detector with Remote Interface (ASDE-X with SMR3) 03-26-2013
JO 6330.92 AJW-148 ASDE-X SMR Antenna Inspection 08-20-2013
JO 6330.93 AJW-148 Interim Maintenance Schedules and Procedures for Airport Surface Detection Equipment Model X Remote Unit Antenna Support Structures 08-21-2014
JO 6340.88 AJW-142 SAFETY NOTICE - INTERIM GUIDANCE FOR CHECKING PEDESTAL OIL PRESSURE AT ARSR-1, ARSR-2, CARSR, AND FPS RADAR FACILITIES 12-19-2012
JO 6340.89 AJW-142 SAFETY NOTICE - INTERIM GUIDANCE FOR CHECKING PEDESTAL OIL PRESSURE AT ARSR-1, ARSR-2, CARSR, and FPS RADAR FACILITIES 11-22-2013
JO 6360.80 AJW-1471 Interim Maintenance Procedure for the Air Traffic Control Beacon Interrogator 6 Mode 4 (ATCBI-6M) System 02-13-2014
N JO 6460.14 AJW-176 Maintenance of the Weather and Radar Processor (WARP) for Technical Operations Services 06-07-2013
JO 6470.51 AJW-223 Interim Clarification Parameters for Order JO 6470.5A 06-17-2013
JO 6470.52 AJW-223 Cancellation of Notice N JO 6470.50, Change in TPR Requirement for ACEPS 02-03-2014
JO 6470.53 AJW-223 Interim Guidelines for Standards, Tolerances, and Maintenance of Air Route Traffic Control Center (ARTCC) Critical Essential Power System (ACEPS) Type II 02-06-2014
JO 6470.54 AJW-223 INTERIM CLARIFICATION PARAMETERS FOR ORDER JO 6470.5A 07-08-2014
JO 6480.77 AJW-223 Interim Guidelines for Standards, Tolerances, Maintenance, and Certification of the Anchorage ARTCC Temporary Critical Power System << WEB RELEASE ONLY >> 06-06-2012
JO 6480.79 AJW-223 Interim Guidelines for Standards, Tolerances, Maintenance, and Certification of the Atlanta ARTCC Temporary Critical Power System 04-19-2013
JO 6480.80 AJW-223 Interim Guidelines for Standards, Tolerances, Maintenance, and Certification of the Los Angeles ARTCC Temporary Critical Power 02-04-2014
JO 6490.16 AJW-173 Maintenance of RCO Facilities Air-to-Ground Communication Equipment 03-30-2012
JO 6490.17 AJW-173 Maintenance of RCO Facilities Air-to-Ground Communication Equipment 01-25-2013
JO 6500.38 AJW-173 Interim Maintenance Notice for VOLMET Equipment 04-18-2013
JO 6520.1 AJW-173 Interim Maintenance of Self Sustaining Outlets (SSO) Facilities, Services, and Equipment 06-29-2012
JO 6520.2 AJW-173 Interim Maintenance of Self Sustaining Outlets (SSO) Facilities, Services and Equipment 12-03-2012
JO 6520.3 AJW-173 Interim Maintenance of Self Sustaining Outlets (SSO) Facilities, Services, and Equipment 01-13-2014
JO 6540.43 AJW-178 Notice of Intent for Revision of Order JO 6540.5A, Maintenance of Radio Communications Link (RCL) Systems 08-20-2012
JO 6540.44 AJW-178 Interim Maintenance Requirements for the LEDR 900S Radio Equipment 11-05-2012

76100 of 379 results.

Export to MS Excel