« Back to Orders & Notices Main Page

Notices

101125 of 439 results.

Export to MS Excel

Orders and Notices Search Results
Number Office Title Date
8900.263 AFS-300 Part 121, 121/135, and 135 (10 or more) Part D and E Operations Specifications (OpSpecs) Nonstandard Language Authorizations 05-19-2014
8900.286 AFS-200 Part 121 Training Program Review 03-09-2015
N JO 6190.76 AJT-14 PEN AND INK CHANGES TO ORDER JO 6190.12E, MAINTENANCE OF THE AUTOMATED RADAR TERMINAL SYSTEM (ARTS IIIE) HANDBOOK 12-20-2013
N JO 6190.77 AJT-14 PEN AND INK CHANGES TO ORDER 6190.12E, MAINTENANCE OF THE AUTOMATED RADAR TERMINAL SYSTEM (ARTS IIIE) 03-24-2014
JO 6850.63 AJW-143 Order JO 6850.5C Interim Procedure Change, ALSF 1-Second Power Transfer Testing 04-16-2014
N JO 6690.19 AJW-174 Order JO 6690.3C, Replacement of Paragraph 5-77 10-28-2014
N JO 6690.17 AJW-174 Order JO 6690.3C, Replacement of Paragraph 5-77 07-26-2013
N JO 6690.20 AJW-17 Order JO 6690.3C, Paragraph 5-32 04-01-2015
JO 6690.18 AJW-174 Order JO 6690.3, Update to Input Voltage Specifications 01-22-2014
N JO 6190.78 AJE-223 Order JO 6190.16, Maintenance of Micro-En Route Automated Radar Tracking System (Micro-EARTS) 07-08-2014
N JO 6180.25 AJW-177 Order JO 6180.13, National Airspace Data Interchange Network (NADIN) Message Switch Network Equipment Maintenance Handbook 04-24-2013
N JO 6140.25 AJW-17 Order JO 6140.17, Remote Monitoring and Logging System (RMLS) Maintenance Handbook 08-20-2013
N JO 6140.24 AJW-175 Order JO 6140.17, Remote Monitoring and Logging System (RMLS) Maintenance Handbook 08-31-2012
N JO 6110.46 AJE-25 Order JO 6110.13, Waivers for Standards and Tolerances 12-19-2012
N JO 6110.43 AJE-221 Order JO 6110.13, Time Intervals for SDPS and SNCS Server Switchover PMs 09-10-2012
N JO 6110.50 AJE-221 Order JO 6110.13, Specific Time Intervals for SDPS and SNCS Server Switchovers 01-23-2015
N JO 6110.41 AJE-221 Order JO 6110.13, Remove Battery Replacement Checks 06-13-2012
N JO 6110.42 AJE-221 Order JO 6110.13, OCAT Firewall Performance Check Procedure 09-10-2012
N JO 6110.49 AJE-223 Order JO 6110.13, Maintenance of the Advanced Technologies and Oceanic Procedures (ATOP) System 07-08-2014
N JO 6110.48 AJE-221 Order JO 6110.13, Maintenance of the Advanced Technologies and Oceanic Procedures (ATOP) System 08-08-2013
N JO 6110.47 AJW-1 Order JO 6110.13, Changes to the Reconfiguration Capability 06-11-2013
N JO 6110.44 AJE-25 Order JO 6110.13, Changes for Performance Check Procedures 519 12-19-2012
N JO 6110.45 AJE-25 Order JO 6110.13, Change for Weather Data 12-19-2012
JO 7210.830 AJT-2 Opposite Direction Operations 11-08-2012
8900.278 AFS-300 Operations Specifications A001, A002, A003, A004, A005, A006, A007, A012, A013, A025, B002, B003, and B004 for Part 147 11-21-2014

101125 of 439 results.

Export to MS Excel