« Back to Orders & Notices Main Page

Notices

151 - 175 of 357 results.
First Previous 6 [7] 8 9 10 Next Last
Number Office Title Date
N JO 6191.13 AJT-14 Notice for Alternate Terminal Surveillance Parallel Approach Display (TSPAD) Accuracy Check procedure for Radar in Order 6191.3A CHG 03, Standard Terminal Automation Replacement System (STARS) Maintenance Handbook Revision 3A Change 03, Attachment 1. 11-14-2012
N JO 6190.69 AJT-14 ORDER 6190.19B, MAINTENANCE OF THE AUTOMATED RADAR TERMINAL SYSTEM (ARTS IIE). MSAW/CA FUNCTIONAL TEST 10-11-2012
N JO 6131.12 AJT-14 Electronic Flight Strip Transfer System (EFSTS) to Authorize Use and Configure the Metrologic Orbit/7120 Scanner 05-15-2012
N JO 6191.11 AJT-142 Notice for Modification of Radar Tower Display System (RTDS) Performance Check Periodicity in Standard Terminal Automation Replacement System (STARS) Maintenance Handbook Revision 3A Change 03 05-29-2012
JO 7110.646 AJT-2 Area Forecast (FA) Schedule 11-12-2013
JO 7210.851 AJT-2 Position Responsibilities 08-20-2013
JO 7110.633
[ 13/23 ]
AJT-2 Change to FAA Order JO 7110.65, Paragraph 5-5-7, Passing and Diverging 08-08-2013
JO 7210.850
[ 13/21 ]
AJT-2 CANCELLATION OF GENOT 7210.849 (GENOT RWA 13/19), & ISSUANCE OF GENOT 7210.850, SIMULTANEOUS INDEPENDENT CLOSE PARALLEL APPROACHES - HIGH UPDATE RADAR NOT REQUIRED 08-05-2013
JO 7110.630
[ 13/16 ]
AJT-2 Change to FAA Notice JO 7110.621 Separation 07-10-2013
JO 7110.629 AJT-2 Takeoff Roll 07-03-2013
JO 7110.624 AJT-2 Simultaneous Offset Instrument Approaches (SOIA) - High Update Radar 06-14-2013
JO 7110.625 AJT-2 Simultaneous Independent Close Parallel Approaches - High Update Radar Not Required 06-14-2013
JO 7210.848 AJT-2 Simultaneous Independent Close Parallel Approaches- High Update Radar Not Required 06-14-2013
JO 7110.621 AJT-2 Separation 06-04-2013
JO 7210.845 AJT-2 Guidance for Radar Target Sizing 05-22-2013
JO 7110.619 AJT-2 Numbers Usage 05-22-2013
JO 7110.618 AJT-2 Guidance for the Use of Runway Status Lights (RWSL) Light System 03-29-2013
JO 7210.842 AJT-2 Guidance for the Use of Runway Status Lights (RWSL) Light System 03-29-2013
JO 7110.615 AJT-2 Approach Clearance 03-21-2013
JO 7210.831 AJT-2 Line Up and Wait (LUAW) Operations 11-15-2012
JO 7210.830 AJT-2 Opposite Direction Operations 11-08-2012
JO 7930.104 AJV-0 Area Movement Information: Notices to Airmen (NOTAM) 04-23-2013
JO 8020.190 AJV-0 Guidance to Air Traffic Incidents Notification and Reporting 02-01-2013
JO 1720.90 AJV-0 Electronic Access to Operationally Significant Air Traffic Organization (ATO) Directives for FAA Regional Offices, ATO Service Areas Offices, the William J. Hughes Technical Center and the Mike Monroney Aeronautical Center 11-08-2012
JO 7340.322
[ 13/17 ]
AJV-1 Additions per Order 7340.2, Contractions, Chapter 3, Sections 1, 2, 3 07-17-2013
151 - 175 of 357 results.
First Previous 6 [7] 8 9 10 Next Last