|
JO 6550.15
|
AJW-178
|
Interim Maintenance Procedures for the Tower Data Link Services II (TDLS2) Equipment
|
03-28-2013 |
|
JO 6650.52
|
AJW-178
|
Interim Notice for Fujitsu Flashwave 4100 and Flashwave 4020/4010
|
02-14-2013 |
|
JO 6540.45
|
AJW-178
|
Interim LDRCL Battery and Rectifier Information
|
12-03-2012 |
|
JO 6600.61
|
AJW-178
|
Interim Notice to Add Aeroflex 3920 Test Equipment to Order JO 6600.31 NRCS VHF/FM Maintenance Handbook
|
11-09-2012 |
|
JO 6540.44
|
AJW-178
|
Interim Maintenance Requirements for the LEDR 900S Radio Equipment
|
11-05-2012 |
|
JO 6540.43
|
AJW-178
|
Notice of Intent for Revision of Order JO 6540.5A, Maintenance of Radio Communications Link (RCL) Systems
|
08-20-2012 |
|
JO 6000.229
|
AJW-178
|
Guidance for Release of JO 6000.204, Maintenance of NAS Telecommunications and References to Canceled Handbooks (JO 6000.22B, 6000.47A, 6000.200)
|
06-29-2012 |
|
JO 6000.228
|
AJW-178
|
Transition of Bandwidth Manager to the Logistics Center
|
05-24-2012 |
|
JO 6550.14
|
AJW-178
|
Interim Maintenance Procedures for the System Wide Information Management (SWIM) Terminal Data Distribution System (STDDS) Equipment
|
04-30-2012 |
|
JO 6650.50
|
AJW-178
|
Interim Support Plan (ISP) for Nortel/Ciena FOTS Solution
|
04-06-2012 |
|
JO 6882.23
|
AJW-192
|
Interim Guidance on HDH and SZP Site Verification Procedures
|
01-22-2013 |
|
JO 6882.22
|
AJW-192
|
Interim Maintenance Task Guidance on Addition of AMR (PRN 133)
|
09-27-2012 |
|
JO 6882.21
|
AJW-192
|
GPS Flex Power Impact on WAAS
|
04-12-2012 |
|
JO 6980.135
|
AJW-223
|
Notice of Intent for Revision of Order JO 6980.25C, Maintenance of Batteries for Standby Power
|
06-06-2013 |
|
JO 6950.40
|
AJW-223
|
Notice of Intent for Revision of Maintenance of Electrical Distribution Systems
|
02-26-2013 |
|
JO 6980.133A
|
AJW-223
|
Air Route Traffic Control Center (ARTCC) Critical Essential Power System (ACEPS) Type II Phase I Installation Interim Documentation
|
01-29-2013 |
|
JO 6480.77
|
AJW-223
|
Interim Guidelines for Standards, Tolerances, Maintenance, and Certification of the Anchorage ARTCC Temporary Critical Power System << WEB RELEASE ONLY >>
|
06-06-2012 |
|
JO 6980.131
|
AJW-223
|
Notice of Intent for New Maintenance Handbook JO 6980.XX, Maintenance of Storage Tank Systems
|
04-19-2012 |
|
JO 6980.132
|
AJW-223
|
Interim Guidance for Maintenance of Engine Generators
|
04-19-2012 |
|
JO 3900.74
|
AJW-23
|
Lockout/Tagout Procedures - New Equipment Installation and Major Modifications
|
07-10-2012 |
|
JO 1100.343
|
AJW-24
|
Establishment of the Mobile Asset Management Program (MAMP) Office
|
03-04-2013 |
|
JO 1100.334
|
AJW-24
|
Establishment of the Mobile Assets Management Program (MAMP) Office
|
02-05-2013 |
|
1100.340
|
ANG-1
|
Realignment of Assistant Administrator for NextGen
|
08-24-2012 |
|
NG CT 7110.617
|
ANG-C
|
AvMet Volcanic Ash
|
03-27-2013 |
|
NG JO 7210.839
|
ANG-C
|
AvMet Volcanic Ash
|
03-27-2013 |