« Back to Orders & Notices Main Page

Notices

2650 of 262 results.

Export to MS Excel

Orders and Notices Search Results
Number Office Title Date
N JO 6190.79 AJT-149 Notice for ARTS IIIE Final Monitor Aid (FMA) Certification Procedures 10-08-2015
N JO 6191.25 AJT-14 Notice for Alternate Terminal Surveillance Parallel Approach Display (TSPAD) Checks for Radar in Order 6191.3A CHG 03, Standard Terminal Automation Replacement System (STARS) Maintenance Handbook Revision 3A Change 03 11-14-2014
N JO 6191.26 AJT-14 Notice for Correct Certification Maintenance Log Designation in FAA Order 6191.4, Standard Terminal Automation Replacement System (STARS) Local Integrated Tower Equipment (LITE) Maintenance Technical Handbook 09-10-2015
JO 6200.56 AJW-141 Planned Test Equipment Updates to the National Calibration Service Contract for 1 April 2016 03-08-2016
JO 6200.57 AJW-141 National Test Equipment Program Web Site COMM APP Link for Information and Training 04-15-2016
JO 6310.81 AJW-147 Change in Requirement for Digital System Sensitivity (DSS) on Airport Surveillance Radar Model 11 (ASR-11) Systems 03-08-2016
JO 6310.82 AJW-146 ASR-9 Flight Safety Related PM Requirements 04-27-2016
JO 6315.65 AJW-144 SAFETY NOTICE – Replacement of the TDWR Elevation Drive Gear Lube Canisters 11-06-2014
JO 6315.67 AJW-144 Notice of Intent for Revision of JO 6315.2C, Maintenance of Terminal Doppler Weather Radar (TDWR) Equipment 04-27-2016
JO 6330.95 AJW-148 Interim Procedures for Order JO 6330.36A, ASDE-X Tech Refresh-System Processor 03-02-2016
JO 6330.96 AJW-141 RU Transmission Line Issues 04-11-2016
JO 6340.90 AJW-142 SAFETY NOTICE - INTERIM GUIDANCE FOR CHECKING PEDESTAL OIL PRESSURE AT CARSR, ARSR-1, and FPS RADAR FACILITIES 11-22-2014
JO 6340.91 AJW-142 SAFETY NOTICE - INTERIM GUIDANCE FOR CHECKING PEDESTAL OIL PRESSURE AT CARSR RADAR FACILITIES 06-10-2015
JO 6470.55 AJW-223 Interim Clarification of Parameters for Order JO 6470.5A 07-07-2015
JO 6470.56 AJW-223 Interim Guidance for Order JO 6470.5A Standards, Tolerances, and Periodic Maintenance, to comply with Order 6000.15 and eTPR requirements. 09-10-2015
JO 6470.57 AJW-223 Interim guidance for Order 6470.40 Standards, Tolerances, and Periodic Maintenance, to comply with Order 6000.15 and eTPR requirements. 09-10-2015
JO 6470.58 AJW-223 Notice of Intent for Revision of Order JO 6470.40, Maintenance of Air Route Traffic Control Center (ARTCC) Critical Essential Power Systems (ACEPS) Type II 05-20-2016
JO 6480.81 AJW-223 Interim Maintenance for Schneider Electric P-Frame Breakers, Order JO 6480.22 05-01-2015
JO 6480.82 AJW-223 Interim Guidance for Order 6480.25 Standards, Tolerances, and Periodic Maintenance, to comply with Order 6000.15 and eTPR requirements. 09-10-2015
JO 6480.83 AJW-223 Standards and Tolerance Correction for EG Voltage, Order JO 6480.22 02-03-2016
JO 6480.84 AJM-25 Release Order JO 6480.24A, Maintenance of Time Based Flow Management System 03-25-2016
JO 6480.85 AJW-223 Interim Maintenance of Schneider Electric P-Frame Breakers, Order JO 6480.22 05-04-2016
JO 6500.40 AJW-1731 Interim Maintenance Notice for VOLMET Equipment 08-13-2015
JO 6500.41 AJW-173 Interim Maintenance Notice for EYWA RCAG in Key West FL 04-15-2016
JO 6520.4 AJW-173 Interim Maintenance of Self Sustaining Outlets (SSO) Facilities, Services, and Equipment 12-30-2015

2650 of 262 results.

Export to MS Excel