|
N JO 6110.44
|
AJE-25
|
Order JO 6110.13, Changes for Performance Check Procedures 519
|
12-19-2012 |
|
N JO 6110.45
|
AJE-25
|
Order JO 6110.13, Change for Weather Data
|
12-19-2012 |
|
N JO 6110.46
|
AJE-25
|
Order JO 6110.13, Waivers for Standards and Tolerances
|
12-19-2012 |
|
N JO 6131.12
|
AJT-14
|
Electronic Flight Strip Transfer System (EFSTS) to Authorize Use and Configure the Metrologic Orbit/7120 Scanner
|
05-15-2012 |
|
N JO 6140.24
|
AJW-175
|
Order JO 6140.17, Remote Monitoring and Logging System (RMLS) Maintenance Handbook
|
08-31-2012 |
|
N JO 6180.25
|
AJW-177
|
Order JO 6180.13, National Airspace Data Interchange Network (NADIN) Message Switch Network Equipment Maintenance Handbook
|
04-24-2013 |
|
N JO 6190.69
|
AJT-14
|
ORDER 6190.19B, MAINTENANCE OF THE AUTOMATED RADAR TERMINAL SYSTEM (ARTS IIE). MSAW/CA FUNCTIONAL TEST
|
10-11-2012 |
|
N JO 6190.70
|
AJT-14
|
Updated National Stock Number (NSN) For Common Automated Radar Terminal System (CARTS) 1E Keyboard
|
01-30-2013 |
|
N JO 6190.71
|
AJT-14
|
Updated National Stock Number (NSN) For Common Automated Radar Terminal System (CARTS) 3E Keyboard
|
01-30-2013 |
|
N JO 6191.11
|
AJT-142
|
Notice for Modification of Radar Tower Display System (RTDS) Performance Check Periodicity in Standard Terminal Automation Replacement System (STARS) Maintenance Handbook Revision 3A Change 03
|
05-29-2012 |
|
N JO 6191.13
|
AJT-14
|
Notice for Alternate Terminal Surveillance Parallel Approach Display (TSPAD) Accuracy Check procedure for Radar in Order 6191.3A CHG 03, Standard Terminal Automation Replacement System (STARS) Maintenance Handbook Revision 3A Change 03, Attachment 1.
|
11-14-2012 |
|
N JO 6191.14
|
AJT-14
|
Notice to Include RTDS-ADSS certification table in Order 6191.3A CHG 03, Standard Terminal Automation Replacement System (STARS) Maintenance Handbook Revision 3A Change 03
|
11-28-2012 |
|
JO 6315.59
|
AJW-144
|
Interim Change to Order JO 6315.2C, Maintenance of Terminal Doppler Weather Radar (TDWR) Equipment for Output Power
|
07-05-2012 |
|
JO 6330.82
|
AJW-148
|
Procedure to Clean the ASDE-3 EDL Monitor Filter Screen and Cathode Ray Tube (CRT) Screen Face
|
05-02-2012 |
|
JO 6330.83
|
AJW-148
|
Interim Maintenance Procedures for IF Detector with Remote Interface (ASDE-3)
|
07-18-2012 |
|
JO 6330.84
|
AJW-148
|
Interim Maintenance Procedures for IF Detector.with Remote Interface (ASDE-X with SMR3)
|
07-18-2012 |
|
JO 6330.85
|
AJW-148
|
Safety Notice Interim Procedures for Checking ASDE-X SMR Antenna Ice Buildup Hazard
|
07-20-2012 |
|
JO 6330.86
|
AJW-148
|
Interim Procedures for Preventative Maintenance (PM) References
|
11-19-2012 |
|
JO 6330.87
|
AJW-148
|
Interim Procedures to Update Safety Logic Alert Check
|
11-19-2012 |
|
JO 6330.88
|
AJW-148
|
Interim Requirement for Microprocessor Battery Replacement
|
12-14-2012 |
|
JO 6330.90
|
AJW-148
|
Interim Procedure for Power Supply/Modulator Setup on ASDE-X with SMR-3
|
01-02-2013 |
|
JO 6330.91
|
AJW-148
|
Interim Maintenance Procedures for IF Detector with Remote Interface (ASDE-X with SMR3)
|
03-26-2013 |
|
JO 6340.88
|
AJW-142
|
SAFETY NOTICE - INTERIM GUIDANCE FOR CHECKING PEDESTAL OIL PRESSURE AT ARSR-1, ARSR-2, CARSR, AND FPS RADAR FACILITIES
|
12-19-2012 |
|
JO 6480.77
|
AJW-223
|
Interim Guidelines for Standards, Tolerances, Maintenance, and Certification of the Anchorage ARTCC Temporary Critical Power System << WEB RELEASE ONLY >>
|
06-06-2012 |
|
JO 6490.16
|
AJW-173
|
Maintenance of RCO Facilities Air-to-Ground Communication Equipment
|
03-30-2012 |