« Back to Orders & Notices Main Page

Notices

5175 of 393 results.

Export to MS Excel

Orders and Notices Search Results
Number Office Title Date
N JO 6190.70 AJT-14 Updated National Stock Number (NSN) For Common Automated Radar Terminal System (CARTS) 1E Keyboard 01-30-2013
N JO 6190.71 AJT-14 Updated National Stock Number (NSN) For Common Automated Radar Terminal System (CARTS) 3E Keyboard 01-30-2013
N JO 6190.72 AJT-14 ORDER 6190.19B, MAINTENANCE OF THE AUTOMATED RADAR TERMINAL SYSTEM (ARTS IIE). MSAW/CA FUNCTIONAL TEST 10-19-2013
N JO 6190.76 AJT-14 PEN AND INK CHANGES TO ORDER JO 6190.12E, MAINTENANCE OF THE AUTOMATED RADAR TERMINAL SYSTEM (ARTS IIIE) HANDBOOK 12-20-2013
N JO 6190.77 AJT-14 PEN AND INK CHANGES TO ORDER 6190.12E, MAINTENANCE OF THE AUTOMATED RADAR TERMINAL SYSTEM (ARTS IIIE) 03-24-2014
N JO 6190.78 AJE-223 Order JO 6190.16, Maintenance of Micro-En Route Automated Radar Tracking System (Micro-EARTS) 07-08-2014
N JO 6191.11 AJT-142 Notice for Modification of Radar Tower Display System (RTDS) Performance Check Periodicity in Standard Terminal Automation Replacement System (STARS) Maintenance Handbook Revision 3A Change 03 05-29-2012
N JO 6191.13 AJT-14 Notice for Alternate Terminal Surveillance Parallel Approach Display (TSPAD) Accuracy Check procedure for Radar in Order 6191.3A CHG 03, Standard Terminal Automation Replacement System (STARS) Maintenance Handbook Revision 3A Change 03, Attachment 1. 11-14-2012
N JO 6191.14 AJT-14 Notice to Include RTDS-ADSS certification table in Order 6191.3A CHG 03, Standard Terminal Automation Replacement System (STARS) Maintenance Handbook Revision 3A Change 03 11-28-2012
N JO 6191.15 AJT-14 Notice of Intent for Stardard Terminal Automation Replacement System (STARS) for G4 Configurations 06-20-2013
N JO 6191.16 AJT-14 Notice of Modification of Radar Tower Display System (RTDS) Performance Check Periodicity in Order 6191.3A Chg 03, Standard Terminal Automation Replacement System (STARS) Maintenance Handbook Revision 3A Change 03 06-04-2013
N JO 6191.18 AJT-14 Notice for Alternate Terminal Surveillance Parallel Approach Display (TSPAD) checks for Radar in Order 6191.3A CHG 03, Standard Terminal Automation Replacement System (STARS) Maintenance Handbook Revision 3A Change 03 11-14-2013
N JO 6191.19 AJT-14 Notice to Include RTDS-ADSS certification table in Order 6191.3A CHG 03, Standard Terminal Automation Replacement System (STARS) Maintenance Handbook Revision 3A Change 03 03-07-2014
N JO 6191.20 AJT-14 Notice to Cancel N JO 6191.19, Notice to Include RTDS-ADSS Certification Table in Order 6191.3A CHG 03, Standard Terminal Automation Replacement System (STARS) Maintenance Handbook Revision 3A Change 03 07-23-2014
N JO 6191.21 AJT-14 Notice for Handbook Revisions Regarding References of Barco Manual in the JO6191.3A CHG 03. 09-10-2014
N JO 6191.22 AJT-14 Notice to Include RTADS-ADSS Certification Table in Order 6191.3A CHG 03, Standard Terminal Automation Replacement System (STARS) Maintenance Handbook Revision 3A Change 03 10-16-2014
N JO 6191.23 AJT-14 Notice of Intent for Standard Terminal Automation Replacement System (STARS) Enhanced Local Integrated Tower Equipment (ELITE) Configuration 09-15-2014
N JO 6191.24 AJT-14 Notice to Remove Firewall References from Order 6191.3A CHG 03, Standard Terminal Automation Replacement System (STARS) Maintenance Handbook Revision 3A Change 03 10-16-2014
N JO 6191.25 AJT-14 Notice for Alternate Terminal Surveillance Parallel Approach Display (TSPAD) Checks for Radar in Order 6191.3A CHG 03, Standard Terminal Automation Replacement System (STARS) Maintenance Handbook Revision 3A Change 03 11-14-2014
JO 6310.80 AJW-1471 ASR-11 Interim Guidance to TR Tube Suppression Values 02-13-2014
JO 6315.59 AJW-144 Interim Change to Order JO 6315.2C, Maintenance of Terminal Doppler Weather Radar (TDWR) Equipment for Output Power 07-05-2012
JO 6315.60 AJW-1442 SAFETY NOTICE -- Replacement of the TDWR Elevation Drive Gear Lub Canisters 03-04-2013
JO 6315.61 AJW-1442 Interim Guidance for Waveguide Switch Error During Channel B Certification 05-31-2013
JO 6315.62 AJW-1442 Interim BCS Performance Checks for Order JO 6315.2C, Maintenance of TDWR Equipment 07-24-2013
JO 6315.63 AJW-144 Procedure to Change the Data Array on the In Phase and Quadrature (I&Q) Recorder 08-09-2013

5175 of 393 results.

Export to MS Excel