« Back to Orders & Notices Main Page

Notices

101125 of 413 results.

Export to MS Excel

Orders and Notices Search Results
Number Office Title Date
JO 6315.64 AJW-1442 Interim Guidance for DSP/REX Computer Removal/Replacement Procedures 08-15-2014
JO 6315.62 AJW-1442 Interim BCS Performance Checks for Order JO 6315.2C, Maintenance of TDWR Equipment 07-24-2013
JO 6315.61 AJW-1442 Interim Guidance for Waveguide Switch Error During Channel B Certification 05-31-2013
JO 6315.60 AJW-1442 SAFETY NOTICE -- Replacement of the TDWR Elevation Drive Gear Lub Canisters 03-04-2013
JO 6315.65 AJW-144 SAFETY NOTICE – Replacement of the TDWR Elevation Drive Gear Lube Canisters 11-06-2014
JO 6560.105 AJW-144 Calibration of Newer Ultrasonic Wind Sensors 06-17-2014
JO 6315.63 AJW-144 Procedure to Change the Data Array on the In Phase and Quadrature (I&Q) Recorder 08-09-2013
JO 6560.104 AJW-144 Interim Maintenance and Certification Requirements for the Wind Measuring Equipment (WME) 04-26-2013
JO 6315.59 AJW-144 Interim Change to Order JO 6315.2C, Maintenance of Terminal Doppler Weather Radar (TDWR) Equipment for Output Power 07-05-2012
JO 6850.64 AJW-143 Interim Certification Parameters and Tasks for FA-30200 PAPI to Order JO 6850.5 12-12-2014
JO 6820.39 AJW-143 Interim Notice to Clarify Battery Maintenance in the Latest Edition of Order JO 6820.7 12-01-2014
JO 6730.10 AJW-143 Interim Guidance for the Wilcox 596 DME, Decoder Minimum Acceptance Range 12-01-2014
JO 6730.11 AJW-143 NOTICE TO CLARIFY RECEIVER SELECTIVITY IN THALES 415 DME IN ORDER JO 6730.2 12-01-2014
JO 6750.180 AJW-143 Interim Update to Order JO 6750.49A, Maintenance of Instrument Landing System (ILS) Facilities, Table 5-4, Snow Removal Versus Snow Depth 11-19-2014
JO 6850.63 AJW-143 Order JO 6850.5C Interim Procedure Change, ALSF 1-Second Power Transfer Testing 04-16-2014
JO 6750.179 AJW-143 Interim Procedures to Check Configuration of ICMS 03-13-2014
JO 6650.53 AJW-143 Interim Updates to Order JO 6650.6D, Maintenance of Radio Control Equipment for Plant Facilities 11-01-2013
JO 6850.62 AJW-143 Release of Temporary Hold on SSM-ALSH-009 09-27-2013
JO 6750.177 AJW-143 Notice of Intent for Revision of Order JO 6750.49, Maintenance of Instrument Landing System (ILS) Facilities 07-24-2013
JO 6750.178 AJW-143 Interim Maintenance Procedures for ILS 420 07-22-2013
JO 6850.61 AJW-143 Notice of Intent for New Maintenance Handbook, JO 6850.XX, Maintenance of the Runway Status Lights (RWSL) System, Type FA-29900 04-24-2013
JO 6750.176 AJW-143 Continuation of the Temporary Hold on SSM-ARMS-006 and SSM-ARMS-007 01-30-2013
JO 6850.60 AJW-143 Temporary Hold on SSM-ALSH-009 01-24-2013
JO 6650.51 AJW-143 Notice for Updates to Selectivity Bandwidth and Frequency Parameters, Order JO 6650.6D 10-24-2012
JO 6820.38 AJW-143 Interim Guidance for Calibration of Wattmeter Elements for VOR and TACAN Equipment 10-18-2012

101125 of 413 results.

Export to MS Excel