Back to Orders & Notices Main Page Back to Orders & Notices Main Page

Notices

126 - 150 of 355 results.
First Previous [6] 7 8 9 10 Next Last
Number Office Title Date
JO 6882.22 AJW-192 Interim Maintenance Task Guidance on Addition of AMR (PRN 133) 09-27-2012
JO 6882.23 AJW-192 Interim Guidance on HDH and SZP Site Verification Procedures 01-22-2013
JO 6882.25 AJW-14B WAAS Interim Maintenance Guidance for Adding AMR GEO (PRN 133) 10-25-2013
JO 6882.26 AJW-14B Notice of Intent for Revision of Order JO 6882.2A, Maintenance of Wide Area Augmentation System 01-27-2014
JO 6882.27 AJW-14B GPS Flex Power Impact on WAAS 03-12-2014
JO 6950.40 AJW-223 Notice of Intent for Revision of Maintenance of Electrical Distribution Systems 02-26-2013
JO 6950.41 AJW-223 Notice of Intent for Revision of Maintenance of Electrical Systems in Buildings 05-09-2013
JO 6950.42 AJW-223 Interim Standard and Tolerance Guidance for Order JO 6950.22, Maintenance of Electrical Power and Control Cables 08-27-2013
JO 6980.131 AJW-223 Notice of Intent for New Maintenance Handbook JO 6980.XX, Maintenance of Storage Tank Systems 04-19-2012
JO 6980.132 AJW-223 Interim Guidance for Maintenance of Engine Generators 04-19-2012
JO 6980.133 AJW-223 Air Route Traffic Control Center (ARTCC) Critical Essential Power System (ACEPS) Type II Phase I Installation Interim Documentation 01-29-2013
JO 6980.134 AJW-223 Interim Certification Statement for Critical Power Distribution Systems (CPDS) Type 1, 2, 3, Facilities 05-07-2013
JO 6980.135 AJW-223 Notice of Intent for Revision of Order JO 6980.25C, Maintenance of Batteries for Standby Power 06-06-2013
JO 6980.136 AJW-223 Notice of Intent for New Maintenance Handbook, Order JO 6980.XX, Maintenance of Solar Photovoltaic System 06-18-2013
JO 6980.137 AJW-223 Critcal Power Distribution System (CPDS) for I90 Houston TRACON Facility Draft Technical Instruction Manual 01-10-2014
JO 6980.138 AJW-223 Interim Guidelines for Standards, Tolerances, and Maintenance of the Denver TRACON Power System 12-05-2013
JO 6980.139 AJW-223 Air Route Traffic Control Center (ARTCC) Critical Essential Power System (ACEPS) Type II Phase I Installation Interim Documentation 02-04-2014
JO 7110.615 AJT-2 Approach Clearance 03-21-2013
JO 7110.616 AJR-B Volcanic Activity 03-27-2013
JO 7110.618 AJT-2 Guidance for the Use of Runway Status Lights (RWSL) Light System 03-29-2013
JO 7110.619 AJT-2 Numbers Usage 05-22-2013
JO 7110.620
[ 13/09 ]
AJT-1 Change to FAA Notice JO 7110.615, and FAA Order JO 7110.65, paragraph 4-8-1, Approach clearance 05-30-2013
JO 7110.621 AJT-2 Separation 06-04-2013
JO 7110.622 AJE-3 Handling Weather Deviations into Active Special Use Airspace 06-07-2013
JO 7110.623 AJT-2 Guidance for the Implementation of FUSION/ADS-B within CARTS and STARS 06-13-2013
126 - 150 of 355 results.
First Previous [6] 7 8 9 10 Next Last