Metroplexes at a Glance

Metroplexes at a Glance
Metroplex Daily Average by Fiscal Year Projected Annual Benefits Metroplex Phase
2017 Total Operations 2017 Scheduled Flights Fuel Savings (Gallons of fuel in millions) Value of Fuel Savings (Fuel costs in millions) Carbon Savings (Metric tons of carbon in thousands)
Atlanta 3,165 2,335 2.2** $6.3 18.8 Complete
Charlotte 2,735 1,884 4.2*** $12.1 36.0 Complete
Cleveland-Detroit 2,200 1,309 3.4* $9.7 28.9 Implementation
D.C. 2,785 1,998 2.0*** $5.6 16.5 Complete
Denver 2,904 1,503 0.6* $1.8 5.4 Design
Florida 7,316 3,050 5.4* $15.5 46.1 Design
Houston 2,275 1,475 1.8*** $5.3 15.7 Complete
Las Vegas 2,189 954 2.6* $7.5 24.8 Design
North Texas 4,368 2,062 2.6** $7.5 22.4 Complete
Northern California 3,349 2,020 0.7** $2.0 5.6 Complete
Phoenix ---- ---- ---- ---- ---- Cancelled
Southern California 6,106 2,889 3.1*** $8.8 26.0 Complete

Last Updated November 2018

* Indicates data is derived from study team notional models

** Indicates data is derived from design team refined models

*** Indicates analysis is based on radar track data collected during the first three months after the final implementation for that project

The Phoenix Metroplex project was cancelled in 2015. Future procedures will be
developed outside of the Metroplex process.