« Back to Orders & Notices Main Page

Notices

151175 of 490 results.

Export to MS Excel

Orders and Notices Search Results
Number Office Title Date
N JO 6110.42 AJE-221 Order JO 6110.13, OCAT Firewall Performance Check Procedure 09-10-2012
N JO 6110.41 AJE-221 Order JO 6110.13, Remove Battery Replacement Checks 06-13-2012
N JO 6190.78 AJE-223 Order JO 6190.16, Maintenance of Micro-En Route Automated Radar Tracking System (Micro-EARTS) 07-08-2014
N JO 6110.49 AJE-223 Order JO 6110.13, Maintenance of the Advanced Technologies and Oceanic Procedures (ATOP) System 07-08-2014
N JO 6110.46 AJE-25 Order JO 6110.13, Waivers for Standards and Tolerances 12-19-2012
N JO 6110.45 AJE-25 Order JO 6110.13, Change for Weather Data 12-19-2012
N JO 6110.44 AJE-25 Order JO 6110.13, Changes for Performance Check Procedures 519 12-19-2012
JO 7110.634 AJE-3 ATC Service 08-19-2013
JO 7110.622 AJE-3 Handling Weather Deviations into Active Special Use Airspace 06-07-2013
JO 7210.847 AJE-3 Procedures for Conducting Telecons for Weather Impacted Special Use Airspace 06-07-2013
JO 7210.843 AJE-3 Classification of En Route Facilities Equipped with ERAM 04-26-2013
JO 7210.838 AJE-3 Air Traffic Service Continuity and Approval 03-21-2013
JO 7210.837 AJE-3 Special Interest Sites 03-12-2013
JO 7210.836 AJE-3 En Route Traffic Count Data Source and Validation Process 03-04-2013
JO 1000.29 AJE-3 Safety Management System Requirements for En Route and Oceanic Facilities 09-14-2012
JO 7210.815 AJE-3 Classification of En Route Facilities Equipped with ERAM 06-05-2012
JO 1100.353 AJG-0 ATO Mission Support Services, Aeronautical Information Management Directorate and AeroNav Products Directorate Merger 12-12-2014
1100.347 AJG-0 Air Traffic Organization 09-06-2013
JO 3330.71 AJG-R4 Operational Assessment Program (OAP) 04-09-2014
JO 3120.149 AJI-0 Initial Qualification Training, Air Traffic Technical Training JO 3120.4N 09-05-2014
JO 7210.862 AJI-0 Interim Guidance for Technical Operations Mandatory Occurrence Reporting Requirements 01-29-2014
JO 6100.21 AJM-2 Suspend PM Task, Symmetrix 5630 Battery Replacement, in Order JO 6100.1H CHG 5, Maintenance of NAS En Route Stage A — Air Traffic Control System 10-09-2014
JO 6130.17 AJM-2 Revision to JO 6130.3B, Maintenance of Flight Data Input/Output Equipment 09-18-2013
JO 6160.20 AJM-25 Notice Of Intent (NOI) To Release 6160.14, NAS Information Display (NIDS) Maintenance Handbook 06-22-2015
JO 6100.22 AJM-25 Notice Of Intent, Order 6100.1 Maintenance Of NAS En Route Stage A - Air Traffic Control System Air Traffic Control System 06-01-2015

151175 of 490 results.

Export to MS Excel