Skip to Main Content
Search
Contact

LEX ASR-11 outage and weather DATA loss

lexington approach partial weather DATA loss

eastern half of lex airspace, no weather data available (11/02/2026-1/31/2027)

The LEX Airport Surveillance RADAR will be out of service from November 02, 2026, through January 31, 2027 (estimated).

  1. Surrounding ASR, ARSR and ADS-B surveillance feeds should allow normal Air Traffic services to be provided by Lexington Approach.
  2. Non-ADS-B equipped aircraft operating North of HYK below 4,000 MSL may have limited or no radar services.
  3. The Shaded area in the following graphics represents where no weather data will be available from Lexington Approach Control.

(AJV-C23, 10/27/2026)

D O T Triskelion

U.S. Department of Transportation

Federal Aviation Administration

800 Independence Avenue, SW

Washington, DC 20591

(866) TELL-FAA | (866) 835-5322