Skip to page content

USA Banner

Official US Government Icon

Official websites use .gov
A .gov website belongs to an official government organization in the United States.

Secure Site Icon

Secure .gov websites use HTTPS
A lock ( ) or https:// means you’ve safely connected to the .gov website. Share sensitive information only on official, secure websites.

United States Department of Transportation United States Department of Transportation

AC JO 7210.3X - Facility Operation and Administration (Effective 4/3/2014) (Cancelled)

Document Information

Number
JO 7210.3X
Title
Facility Operation and Administration (Effective 4/3/2014)
Date cancelled
2014-04-02
Cancelled by
JO 7210.3Y
Date issued
2012-02-09
Office of Primary Responsibility
AJR-33
Content
Cancels
Cancels
Number Title Date
JO 7210.781 Air Traffic Control Systems Command Center (ATCSCC) Transition Team Duty Requirement Modifications 2011-07-15
JO 7210.818 Approaches to Parallel Runways 2012-07-26
JO 7210.771 Change to JO 7210.3W, Facility Operations and Administration 2011-03-11
JO 7210.789 Comprehensive Electronic Data Analysis and Reporting (CEDAR) 2011-09-19
JO 7210.823 Correction to N JO 7210.822, Midnight Operations 2012-08-15
JO 7210.806 Delay Reporting 2012-02-16
JO 7210.787 Enhancing Airline Passenger Protections (Three/Four-Hour Tarmac Rule) 2011-08-23
JO 7210.816 Enhancing Airline Passenger Protections (Three/Four-Hour Tarmac Rule) 2012-06-06
JO 7210.3W Facility Operation and Administration 2010-02-11
JO 7210.819 Go-Around/Missed Approach 2012-07-26
JO 7210.813 Human Trafficking Reporting 2012-05-15
JO 7210.822 Midnight Operations 2012-08-13
JO 7210.794 Minimum Vectoring Altitude Charts (MVAC) for Facilities Providing Terminal Approach Control Services 2011-10-20
JO 7210.790 National Traffic Management Log (NTML) Procedures 2011-09-23
JO 7210.777 OPEN SKIES F and D Treaty Aircraft 2011-04-27
JO 7210.792 Precision Runway Monitor-Simultaneous Offset Instrument Approaches 2011-10-07
JO 7210.798 Recommendations for Procedural Changes 2011-12-06
JO 7210.783 Relief Periods 2011-07-22
JO 7210.799 Route Test 2011-12-06
JO 7210.786 Runway Construction 2011-08-19
JO 7210.802 Simultaneous Dependent and Independent Approaches 2012-01-09
JO 7210.821 Simultaneous Independent Approaches 2012-08-08
JO 7210.780 Simultaneous Widely Spaced Parallel Operations 2011-06-29
JO 7210.784 Static Coordination 2011-08-16
JO 7210.820 Temporary Flight Restrictions (TFR) 2012-08-03
JO 7210.808 The President, Vice President, and EXEC1F Aircraft Monitoring 2012-04-27
JO 7210.793 Traffic Flow Management (TFM) System 2011-10-11
JO 7210.814 Traffic Management Initiatives (TMI) of 25 Miles-in-Trail (MIT) or Greater 2012-05-22
JO 7210.785 Volcanic Ash 2011-08-16