Document Information
- Number
- JO 7210.3AA
- Title
- Facility Operation and Administration
- Date cancelled
- 2019-08-15
- Cancelled by
- JO 7210.3BB
- Date issued
- 2017-09-12
- Office of Primary Responsibility
- AJV-8, Air Traffic Procedures
- Content
-
- JO 7210.3AA w CHG 1 and CHG 2 and CHG 3 (PDF)
- Basic (PDF)
- Change 1 (PDF)
- Change 2 (PDF)
-
Change 3 (PDF)
The Change 3 pages will be posted as soon as they are available.
- Cancels
-
Cancels Number Title Date JO 7210.905 ASR-8/TDX-2000/Common Terminal Digitizer Radar Systems Weather Display 2017-12-20 JO 7210.910 Air Traffic Control System Command Center (ATCSCC) Space Operations Responsibilities 2018-05-01 JO 7210.907 Altimeter Requirements 2018-02-27 JO 7210.904 Data Communication / Flight Data Unit 2017-07-19 JO 7210.902 Duty Familiarization and the Transfer of Position Responsibility 2017-06-01 JO 7210.903 Expansion of 3 NM Operations in ERAM Facilities 2017-06-15 JO 7210.54C FAA Contract Tower Operation and Administration - With Change 1 2016-05-16 JO 7210.3Z Facility Operation and Administration 2015-11-10 JO 7210.913 Method for Calculating Monitor Alert Parameters 2018-10-23 JO 7210.906 Simultaneous Independent Approaches – Dual & Triple 2017-12-21 JO 7210.908 Simultaneous Independent Approaches; and Simultaneous Widely-Spaced Parallel Operations 2018-04-06 JO 7210.901 Traffic Flow Management Convective Forecast Product (TCF) 2017-03-22