Document Information
- Number
- 150/5320-6D
- Title
- Airport Pavement Design and Evaluation
- Date cancelled
- 2009-09-30
- Cancellation notes
- 150/5320-6E
- Date issued
- 1995-07-07
- Office of Primary Responsibility
- AAS-100, Office of Airport Safety & Standards - Airport Engineering Division
- Description
-
Provides guidance to the public for the design and evaluation of pavements at civil airports.
- Content
-
- 150/5320-6D (Cancelled) (PDF)
- Changes
-
Changes Change Title Date 1 Change 1 - Airport Pavement Design and Evaluation
Corrects errors in the graph for Figure 2-4, Effect of Subbase on Modulus of Subgrade Reaction, and changes a typographical error in paragraph 339b.- 150/5320-6D Change 1 (PDF)
1996-01-30 2 Change 2 - Airport Pavement Design and Evaluation
Incorporates recent changes and corrections.- 150/5320-6D Change 2 (PDF)
2002-06-03 3 Change 3 - Airport Pavement Design and Evaluation
Incorporates recent changes and corrections. This AC cancels AC 150/5320-16, Airport Pavement Design for the Boeing 777 Airplane.- 150/5320-6D Change 3 (PDF)
- 150/5320-6D Change 3 (MS Word)
2004-04-30 4 Change 4 - Airport Pavement Design and Evaluation
Provides design guidance for paved airfield shoulders and rubblization of existing Portland Cement Concrete (PCC) pavements prior to asphalt overlay. Revises guidance on required design flexural strength for rigid pavement design.- 150/5320-6D Change 4 (PDF)
- 150/5320-6D Change 4 (MS Word)
2006-06-23