90-98 - Change 1 to Simultaneous Closely Spaced Parallel Operations at Airports Using Precision Runway Monitor (PRM) Systems
(Cancelled)
- Date cancelled
- 2010-09-28
- Cancellation notes
- MEMO from AJR-137
- Date issued
- 2003-10-06
- Office of Primary Responsibility
- AJR-1, Air Traffic
- Content
-
- AC90-98chg1.pdf (PDF)
- Cancels
-
Cancels Number Title Date 90-98 Simultaneous Closely Spaced Parallel Operations Airports Using Precision Runway Monitor Systems (PRM) 2003-02-28
90-98 - Simultaneous Closely Spaced Parallel Operations Airports Using Precision Runway Monitor Systems (PRM)
(Cancelled)
- Date cancelled
- 2003-10-06
- Cancelled by
- 90-98
- Date issued
- 2003-02-28
- Office of Primary Responsibility
- AFS-5
- Content
-
- AC 90-98.pdf (PDF)