Number | Title | Status | Office | Date |
---|---|---|---|---|
93-3 |
Lengthy Tarmac Delays and Associated Airline/Airport Contingency Plans and Related Air Traffic Control Communications
This AC describes the communication process between a pilot-in-command of a TARMAC delayed aircraft and local air traffic control (ATC). |
Active | AJR-1 | 2010-03-23 |