Skip to page content

USA Banner

Official US Government Icon

Official websites use .gov
A .gov website belongs to an official government organization in the United States.

Secure Site Icon

Secure .gov websites use HTTPS
A lock ( ) or https:// means you’ve safely connected to the .gov website. Share sensitive information only on official, secure websites.

Site Notification

Site Notification

United States Department of TransportationUnited States Department of Transportation

Order JO 7210.3X - Facility Operation and Administration (Effective 4/3/2014) (Cancelled)

Document Information

Type
Order
Number
JO 7210.3X
Title
Facility Operation and Administration (Effective 4/3/2014)
Date issued
2012-02-09
Date cancelled
2014-04-02
Cancelled by
JO 7210.3Y
Office of Primary Responsibility
AJR-33
Access restriction
Public
Content

For more information, contact 9-awa-ait-directives@faa.gov.

Archived notices
Archived notices associated with this order
Number GENOT Title Effective Cancelled
JO 7210.857 Periodic Maintenance 2014-01-20 2014-07-23
JO 7210.839 AvMet Volcanic Ash 2013-03-07 2013-08-22
JO 7210.829 ICAO Flight Plan 2012 Changes to FAA Order JO 7210.3 2012-11-15 2013-08-22
JO 7210.828 Integrated Collaborative Rerouting (ICR) 2012-09-26 2013-09-25
JO 7210.826 Procedures for Opening and Closing Runways 2012-12-12 2013-08-22
JO 7210.827 12/24 Changes to FAA Order JO 7210.3, Appendix 4, Glide Slope Outage Waiver Request 2012-09-14 2013-08-21
JO 7210.825 Air Traffic Currency Requirements 2012-09-17 2013-08-22
JO 7210.824 Interim Guidance for the Transition Period to the ICAO Flight Plan 2012-09-15 2012-11-14
JO 7210.823 12/19 Correction to N JO 7210.822, Midnight Operations 2012-08-15 2013-03-07
JO 7210.822 Midnight Operations 2012-08-15 2013-03-07
JO 7210.821 Simultaneous Independent Approaches 2012-09-10 2013-03-07
JO 7210.820 Temporary Flight Restrictions (TFR) 2012-09-04 2013-03-07
JO 7210.818 Approaches to Parallel Runways 2012-09-28 2013-03-07
JO 7210.819 Go-Around/Missed Approach 2012-09-28 2013-03-07
JO 7210.817 AvMet Volcanic Ash 2012-07-13 2013-03-07
JO 7210.816 Enhancing Airline Passenger Protections (Three/Four-Hour Tarmac Rule) 2012-07-09 2013-03-07
JO 7210.814 Traffic Management Initiatives (TMI) of 25 Miles-in-Trail (MIT) or Greater 2012-06-25 2013-03-07
JO 7210.813 Human Trafficking Reporting 2012-06-18 2013-03-07
JO 7210.811 Procedures for Conducting Telecons for Weather Impacted Special Use Airspace 2012-06-15 2013-06-15
JO 7210.812 Guidance for the Use of Runway Status Lights (RWSL) Light System at Orlando, FL, Airport (MCO) 2012-05-04 2013-05-03
JO 7210.808 The President, Vice President, and EXEC1F Aircraft Monitoring 2012-04-27 2012-07-26
JO 7210.806 Delay Reporting 2012-03-19 2012-07-26
JO 7210.805 Air Traffic Currency Requirements for En Route Facilities 2012-02-11 2013-02-10
JO 7210.803 Interim Guidance in the Preparation of FAA Form 7230-4 2012-01-30 2013-01-29
JO 7210.804 Interim Guidance for Requirements for Mandatory Occurrence Report (MOR) 2012-01-30 2013-01-29
JO 7210.802 Simultaneous Dependent and Independent Approaches 2012-01-18 2012-07-26
JO 7210.800 Guidance for the Implementation of FUSION Displays at Houston (I90) TRACON 2011-12-19 2012-12-18
JO 7210.801 Cancellation of Traffic Management Advisor (TMA) Procedures 2011-12-16 2012-12-15
JO 7210.798 Recommendations for Procedural Changes 2012-01-06 2012-07-26
JO 7210.799 Route Test 2012-01-06 2012-07-26
JO 7210.794 Minimum Vectoring Altitude Charts (MVAC) for Facilities Providing Terminal Approach Control Services 2011-11-21 2012-07-26
JO 7210.793 Traffic Flow Management (TFM) System 2011-11-15 2012-07-26
JO 7210.792 Precision Runway Monitor-Simultaneous Offset Instrument Approaches 2011-10-07 2012-07-26
JO 7210.791 Integrated Collaborative Rerouting (ICR) 2011-09-26 2012-09-25
JO 7210.790 National Traffic Management Log (NTML) Procedures 2011-10-24 2012-07-26
JO 7210.789 Comprehensive Electronic Data Analysis and Reporting (CEDAR) 2011-10-19 2012-07-26
JO 7210.782 Guidance for the Implementation of FUSION/Automatic Dependent Surveillance-Broadcast (ADS-B) within the Common Automated Terminal System Model IIIE (CARTS) at New York (N90) Terminal Radar Approach Control (TRACON) 2011-07-24 2012-07-23
JO 7210.776 11/12 Change to FAA Order JO 7210.3, Paragraph 5-1-2, Monitoring the Presidential Aircraft Flight 2011-04-21 2012-04-20
JO 7210.767 Minimum Vectoring Altitude Charts (MVAC) Procedures for FUSION Displays 2011-02-26 2012-02-25
JO 7210.768 Guidance for the Use of Runway Status Lights (RWSL) Light System at Orlando, FL Airport (MCO) 2011-05-04 2012-05-03
JO 7210.766 Unmanned Aircraft Operations in the National Airspace System (NAS) 2011-03-28 2012-03-27
Cancels
Cancelled documents
Number Title Date
JO 7210.781 Air Traffic Control Systems Command Center (ATCSCC) Transition Team Duty Requirement Modifications 2011-07-15
JO 7210.818 Approaches to Parallel Runways 2012-07-26
JO 7210.771 Change to JO 7210.3W, Facility Operations and Administration 2011-03-11
JO 7210.789 Comprehensive Electronic Data Analysis and Reporting (CEDAR) 2011-09-19
JO 7210.823 Correction to N JO 7210.822, Midnight Operations 2012-08-15
JO 7210.806 Delay Reporting 2012-02-16
JO 7210.787 Enhancing Airline Passenger Protections (Three/Four-Hour Tarmac Rule) 2011-08-23
JO 7210.816 Enhancing Airline Passenger Protections (Three/Four-Hour Tarmac Rule) 2012-06-06
JO 7210.3W Facility Operation and Administration 2010-02-11
JO 7210.819 Go-Around/Missed Approach 2012-07-26
JO 7210.813 Human Trafficking Reporting 2012-05-15
JO 7210.822 Midnight Operations 2012-08-13
JO 7210.794 Minimum Vectoring Altitude Charts (MVAC) for Facilities Providing Terminal Approach Control Services 2011-10-20
JO 7210.790 National Traffic Management Log (NTML) Procedures 2011-09-23
JO 7210.777 OPEN SKIES F and D Treaty Aircraft 2011-04-27
JO 7210.792 Precision Runway Monitor-Simultaneous Offset Instrument Approaches 2011-10-07
JO 7210.798 Recommendations for Procedural Changes 2011-12-06
JO 7210.783 Relief Periods 2011-07-22
JO 7210.799 Route Test 2011-12-06
JO 7210.786 Runway Construction 2011-08-19
JO 7210.802 Simultaneous Dependent and Independent Approaches 2012-01-09
JO 7210.821 Simultaneous Independent Approaches 2012-08-08
JO 7210.780 Simultaneous Widely Spaced Parallel Operations 2011-06-29
JO 7210.784 Static Coordination 2011-08-16
JO 7210.820 Temporary Flight Restrictions (TFR) 2012-08-03
JO 7210.808 The President, Vice President, and EXEC1F Aircraft Monitoring 2012-04-27
JO 7210.793 Traffic Flow Management (TFM) System 2011-10-11
JO 7210.814 Traffic Management Initiatives (TMI) of 25 Miles-in-Trail (MIT) or Greater 2012-05-22
JO 7210.785 Volcanic Ash 2011-08-16