Document Information
- Number
- JO 6480.22
- Title
(%) Maintenance of Dual Redundant Power Distribution Systems (DRPDS) Facilities - Date cancelled
- 2019-12-18
- Cancelled by
- JO 6480.22A
- Date issued
- 2007-09-24
- Office of Primary Responsibility
- AJW-223
- Content
-
- JO 6480.22 Change 1 (PDF)
- JO 6480.22 (PDF)
- Change 2
- Cancels
-
Cancels Number Title Date JO 6480.88 (%) Interim Changes to Order JO 6480.22, Maintenance of Dual Redundant Power Distribution Systems (DRPDS) Facilities to Disable Serial Communication of PDI PDU 2017-03-23 JO 6480.85 (%) Interim Maintenance of Schneider Electric P-Frame Breakers, Order JO 6480.22 2016-05-04 JO 6480.87 (%) Standards and Tolerance Correction for EG Voltage, Order JO 6480.2 2017-01-27