Document Information
- Type
- Order
- Number
- JO 6000.50D
- Title
- National Airspace System
(NAS) Integrated Risk Management - Date issued
- 2011-04-01
- Date cancelled
- 2022-07-06
- Cancelled by
- JO 6000.50E
- Cancellation notes
- This order is canceled by Order JO 6000 50E
- Office of Primary Responsibility
- AJW-163, NAS Operations Policy Team
- Access restriction
- FAA Network Only
- Contact information
-
Lowen Overby
Lowen.Overby@faa.gov
202-493-4368 - Order purpose statement
This order establishes policies n:garding Safety Risk Management (SRM) for maintenance. modification, construction (including design and planning) and installation activities. It also establishes processes for standardiLing the application ofOpcrational Risk Management (ORM) across service units. and identifies the required documentation to verify ORM was completed prior 10 installation (see Appendi x F for definitions). This order complements policies in Order JO 1000.37. Air Traffic Organization (A TO) Safety Management System (SMS). Order 1100.161. Air Trnffic Safety Oversight, Order 6000.15, General Maintenance Handbook for NAS Facilities, Order 7400.2, Procedures for Handling Airspace Matters. the Federal Aviatioo Administration (FAA) Systems Engineering Manual, and the ATO Safety Management System (SMS) Manual
- Content
-
This document's content can be accessed only from within the FAA network.
The document's Office of Primary Responsibility (OPR) is AJW-163.