Document Information
- Number
- 150/5200-30C
- Title
- Airport Winter Safety and Operations
- Date cancelled
- 2016-07-29
- Cancellation notes
- 150/5200-30D
- Date issued
- 2008-12-09
- Office of Primary Responsibility
- AAS-300, Office of Airport Safety and Operations - Airport Safety & Operations Division
- Description
-
This advisory circular (AC) provides guidance to assist airport operators in developing a snow and ice control plan, conducting and reporting runway friction surveys, and establishing snow removal and control procedures. Version B of this AC cancelled AC 150/5220-13B, Runway Surface Condition Sensor Specification Guide, dated March 27, 1991. Consolidated file contains Change 1.
See also Notice to Manufacturers of Airport In-Pavement Stationary Runway Weather Information Systems about AIP Buy American Requirement (10/28/2011). The FAA is requesting information to determine if waivers to this requirement are needed.
- Content
- Changes
-
Changes Change Title Date 1 Change 1 - Airport Winter Safety and Operations
Adds the requirement to identify Aircraft Rescue and Fire Fighting mutual aid access points(s) to include gate(s) operability. This Change is in response to a National Transportation Safety Board safety recommendation.
- 150/5200-30C Change 1 (PDF)
2012-02-15 - Cancels
-
Cancels Number Title Date 150/5200-30B Airport Winter Safety and Operations Provides guidance to assist airport operators in developing a snow and ice control plan, conducting and reporting runway friction surveys, and establishing snow removal and control procedures. Cancels AC 150/5220-13B, Runway Surface Condition Sensor Specification Guide, dated March 27, 1991. 2007-09-05