150/5070-6C - AC 150/5070-6C, Airport Master Plans
- Status
- Inactive
- Date issued
- 2013-06-19
- Office of Primary Responsibility
- APP-400, Office of Airport Planning & Programming, Planning & Environmental Division
- Content
-
This document's content is unavailable.
150/5000-9B - Guidelines for Sound Insulation of Structures Exposed to Aircraft Noise
- Status
- Active
- Date issued
- 2022-06-08
- Office of Primary Responsibility
- APP-400, Office of Airport Planning & Programming, Planning & Environmental Division
- Description
-
This AC provides guidelines to develop and implement a sound insulation program (SIP).
- Content
-
- 150/5000-9B (PDF)
150/5050-4A - Community Involvement in Airport Planning
- Status
- Active
- Date issued
- 2019-10-28
- Office of Primary Responsibility
- APP-400, Office of Airport Planning & Programming, Planning & Environmental Division
- Description
-
This advisory circular (AC) provides information on community/public involvement in airport planning. It describes changes in standards and expectations for community involvement in airport planning since FAA drafted the previous version of this AC.
- Content
-
- 150/5050-4A (PDF)
150/5000-17 - Critical Aircraft and Regular Use Determination
- Status
- Active
- Date issued
- 2017-06-20
- Office of Primary Responsibility
- APP-400, Office of Airport Planning & Programming, Planning & Environmental Division
- Description
-
This advisory circular (AC) defines the term Critical Aircraft and provides guidance on the use of Critical Aircraft in facility planning and design studies, and related FAA decision making, for federally obligated airports. It also defines the term "Regular Use", which replaces the term "Substantial Use" that was used in previous definitions of Critical Aircraft. This AC does not establish project justification for Federal Airport Improvement Program (AIP) funding.
- Content
-
- AC 150/5000-17 (PDF)
150/5000-15B - Announcement of Availability of Airport-Related Research and Development Products
- Status
- Active
- Date issued
- 2013-07-23
- Office of Primary Responsibility
- AAS-100, Office of Airport Safety & Standards - Airport Engineering Division
- Description
-
This AC explains how to obtain the latest airport-related research and development (R&D) products funded by the Federal Aviation Administration’s (FAA’s) Airports Organization, particularly the FAA’s Airport Technology Research and Development Branch, the Airport Cooperative Research Program (ACRP), the Innovative Pavement Research Foundation (IPRF), and the Airfield Asphalt Pavement Technology Program (AAPTP).
- Content
-
- AC 150/5000-15B (PDF)
150/5000-16 - Announcement of Availability of the Guide for Private Flyers - U.S. International Airports
- Status
- Active
- Date issued
- 2010-09-29
- Office of Primary Responsibility
- AAS-100, Office of Airport Safety & Standards - Airport Engineering Division
- Description
-
Announces the availability of the Guide for Private Flyers published by the Department of Homeland Security, U.S. Customs and Border Protection (CBP). The Guide lists all U.S. international airports, designated airports, landing rights airports, and user fee airports. It also defines the term InternationalAirport and clarifies the use of the word International in an airport name. Any airport may use the word International in its name. However, only airports listed in the CBP guide are considered international airports for CBP purposes.
This AC replaces AC 150/5000-5C, Designated U.S. International Airports.
- Content
-
- AC 150/5000-16 (PDF)
150/5000-13A - Announcement Of Availability: RTCA Inc., Document RTCA-221
- Status
- Active
- Date issued
- 2008-09-05
- Office of Primary Responsibility
- AAS-100, Office of Airport Safety & Standards - Airport Engineering Division
- Description
-
Announces the availability of RTCA, Inc., Document RTCA/DO-221, Guidance and Recommended Requirements for Airport Surface Movement Sensors, dated April 24, 1994. Provides recommended minimum performance standards for airport surface movement sensors and specifies both sensor and system characteristics that provide guidance to airport systems designers, manufacturers, installers, and users of the equipment.
Cancels AC 150/5000-13, Announcement of Availability-RTCA Inc., Document RTCA-221, dated September 7, 1994. - Content
-
- AC 150/5000-13A (PDF)
- Cancels
-
Cancels Number Title Date 150/5000-13 Announcement of Availability: RTCA Inc., Document RTCA-221, Guidance and Recommended Requirements for Airport Surface Movement Sensors Announces the availability of RTCA Inc., Document RTCA-221, Guidance and Recommended Requirements for Airport Surface Movement Sensors. 1994-09-07
150/5050-8 - Environmental Management Systems for Airport Sponsors
- Status
- Active
- Date issued
- 2007-09-26
- Office of Primary Responsibility
- APP-400, Office of Airport Planning & Programming, Planning & Environmental Division
- Description
- Provides guidance to airport sponsors that develop Environmental Management Systems (EMS). It provides guidance to airport sponsors on the needed parts of an EMS.
- Content
-
- AC 150/5050-8 (PDF)
150/5070-6B - Airport Master Plans
- Status
- Active
- Date issued
- 2005-07-29
- Office of Primary Responsibility
- APP-400, Office of Airport Planning & Programming, Planning & Environmental Division
- Description
-
Provides guidance for the preparation of airport master plans that range in size and function from small general aviation to large commercial service facilities. Appendix D of this AC cancels Chapter 1, Section 5; Appendix 6; and Appendix 7 of AC 150/5300-13, Airport Design. Consolidated file contains Changes 1 and 2.
- Content
- Changes
-
Changes Change Title Date 1 Change 1 of AC 150/5070-6B
2007-05-01 2 Change 2 of AC 150/5070-6B
2015-01-27
150/5070-7 - The Airport System Planning Process
- Status
- Active
- Date issued
- 2004-11-10
- Office of Primary Responsibility
- APP-400, Office of Airport Planning & Programming, Planning & Environmental Division
- Description
-
Provides guidance for effective airport system planning. Consolidated file includes Change 1 (dated 1/16/2015).
- Content
150/5020-2 - Guidance on the Balanced Approach to Noise Management
- Status
- Active
- Date issued
- 2004-09-28
- Office of Primary Responsibility
- AEE-100, Environment and Energy Noise Division
- Description
- FAA accepts the International Civil Aviation Organization (ICAO) document, Guidance on the Balanced Approach to Aircraft Noise Management, as additional guidance material.
- Content
-
- AC 150/5020-2 (PDF)
150/5060-5 - Airport Capacity And Delay
- Status
- Active
- Date issued
- 1983-09-23
- Office of Primary Responsibility
- APP-400, Office of Airport Planning & Programming, Planning & Environmental Division
- Description
-
Explains how to compute airport capacity and aircraft delay for airport planning and design. Consolidated file contains Changes 1 and 2.
Note: Portions of this AC are under review for update. Please contact the National Planning and Environmental Division for assistance.
Because of the size of this document, it is available as one large file (see Complete) or as several smaller files (see Parts 1-4).
- Content
150/5020-1 - Noise Control and Compatibility Planning for Airports
- Status
- Active
- Date issued
- 1983-08-05
- Office of Primary Responsibility
- APP-400, Office of Airport Planning & Programming, Planning & Environmental Division
- Description
- Provides general guidance for noise control and compatibility planning for airports as well as specific guidance for preparation of airport noise exposure maps and airport noise compatibility programs by airport operators for submission under Title 14, Code of Federal Regulations, Part 150, and the Aviation Safety and Noise Abatement Act of 1979. Contains an expanded Table of Land Uses Normally Compatible with Various Levels of Noise.
- Content
-
- AC 150/5020-1 (PDF)
150/5000-15A - Announcement of Availability of Airport-Related Research and Development Products (Cancelled)
- Date cancelled
- 2013-07-23
- Cancellation notes
- 150/5000-15C
- Date issued
- 2010-04-01
- Office of Primary Responsibility
- AAS-100, Office of Airport Safety & Standards - Airport Engineering Division
- Description
-
Explains how to obtain the latest airport-related research and development (R&D) products funded by the Federal Aviation Administration’s (FAA’s) Airports Organization. This AC describes R&D products from the FAA’s Airport Technology Research and Development Branch, the Airport Cooperative Research Program (ACRP), the Innovative Pavement Research Foundation (IPRF), and the Airfield Asphalt Pavement Technology Program (AAPTP).
- Content
-
- 150/5000-15A (PDF)
- 150/5000-15A (MS Word)
150/5000-15 - Announcement of Availability of Airport-Related Research and Development Products (Cancelled)
- Date cancelled
- 2010-04-01
- Cancellation notes
- 150/5000-15A
- Date issued
- 2008-09-29
- Office of Primary Responsibility
- AAS-100, Office of Airport Safety & Standards - Airport Engineering Division
- Description
-
Explains how to obtain the latest airport-related research and development (R&D) products funded by the Federal Aviation Administration’s (FAA’s) Airports Organization through the agency's Airport Technology Research and Development Branch, the Airport Cooperative Research Program (ACRP), the Innovative Pavement Research Foundation (IPRF), and the Airfield Asphalt Pavement Technology Program (AAPTP).
- Content
-
- 150/5000-15 (PDF)
- 150/5000-15 (MS Word)
150/5000-3T - Address List for Regional Airports Divisions and Airports District/Field Offices (Cancelled)
- Date cancelled
- 1999-10-22
- Cancellation notes
- Internet Listing
- Date issued
- 1997-09-12
- Office of Primary Responsibility
- ARP-10
- Description
-
Transmits the address list for all regional Airports Divisions and Airports District/Field Offices.
View the current list of FAA Regional Airports and Airports District/Field Office.
- Content
-
This document's content is unavailable.
150/5000-5C - Designated U.S. International Airports (Cancelled)
- Date cancelled
- 2009-04-22
- Cancellation notes
- MEMO from AAS-1
- Date issued
- 1996-12-04
- Office of Primary Responsibility
- AAS-300, Office of Airport Safety and Operations - Airport Safety & Operations Division
- Description
-
Explains the different categories of U.S. airports designated to serve international air traffic and provides a listing of these airports.
Cancelled 4/22/2009. AC 150/5000-16,Announcement of Availability of the Guide for Private Flyers – U.S. International Airports, replaces this AC. - Content
-
This document's content is unavailable.
150/5000-14 - Announcement of Availability- National Plan of Integrated Airport Systems (NPIAS) 1993-1997
(Cancelled)
- Date cancelled
- 2007-12-31
- Cancellation notes
- Expired
- Date issued
- 1995-09-12
- Office of Primary Responsibility
- APP-400, Office of Airport Planning & Programming, Planning & Environmental Division
- Description
- This advisory circular announces the availability of the National Plan of Integrated Airport Sys- tems (NPIAS) 1993-1997.
- Content
-
- 150/5000-14 (PDF)
150/5000-13 - Announcement of Availability: RTCA Inc., Document RTCA-221, Guidance and Recommended Requirements for Airport Surface Movement Sensors (Cancelled)
- Date cancelled
- 2008-09-05
- Cancelled by
- 150/5000-13A
- Date issued
- 1994-09-07
- Office of Primary Responsibility
- AAS-100, Office of Airport Safety & Standards - Airport Engineering Division
- Description
- Announces the availability of RTCA Inc., Document RTCA-221, Guidance and Recommended Requirements for Airport Surface Movement Sensors.
- Content
-
This document's content is unavailable.
150/5000-12 - Announcement of Availability: Passenger Facility Charge (PFC) Application (FAA Form 5500-1)
(Cancelled)
- Date cancelled
- 2012-03-05
- Cancellation notes
- APP-500
- Date issued
- 1994-07-15
- Office of Primary Responsibility
- APP-510, Office of Planning & Programming, Financial Analysis & Passenger Facility Charge Branch
- Description
-
Provides guidance for the submission of the PFC application. View more recent versions of the PFC Application.
- Content
-
- 150/5000-12 (PDF)
150/5000-10A - Announcement of Availability Report No. DOT/FAA/PP/-92-6, Estimating the Regional Economic Signifiance of Airports (Cancelled)
- Date cancelled
- Date issued
- 1993-07-02
- Office of Primary Responsibility
- APP-400, Office of Airport Planning & Programming, Planning & Environmental Division
- Content
-
This document's content is unavailable.
150/5000-9A - Announcement of Availability Report No. DOT/FAA/PP/92-5, Guidelines for the Sound Insulation of Residences Exposed to Aircraft Operations (Cancelled)
- Date cancelled
- 2022-06-08
- Cancelled by
- 150/5000-9B
- Cancellation notes
- Superseded
- Date issued
- 1993-07-02
- Office of Primary Responsibility
- APP-400, Office of Airport Planning & Programming, Planning & Environmental Division
- Description
-
Announces availability of Guidelines for the Sound Insulation of Residences Exposed to Aircraft Operations. Updated file includes complete report.
Because of the size of the complete file, we also make it available in 8 parts for easier downloading.
- Content
-
- 150/5000-9A (Complete) (PDF)
- Table of Contents for AC 150/5000-9A (PDF)
-
150/5000-9A (Part 1) (PDF)
Front matter, table of contents, and part of Section 1, Executive Summary (through 1.5)
-
150/5000-9A (Part 2) (PDF)
Continues Section 1.5
-
150/5000-9A (Part 3) (PDF)
Concludes Section 1.5
-
150/5000-9A (Part 4) (PDF)
Includes Section 2, Basic Concepts
-
150/5000-9A (Part 5) (PDF)
Includes Section 3, Project Formulation and Methods (3.1 through 3.5.4.2)
-
150/5000-9A (Part 6) (PDF)
Includes Section 3, Project Formulation and Methods (3.5.4.2 through 3.6.1)
-
150/5000-9A (Part 7) (PDF)
Concludes Section 3, Project Formulation and Methods (3.6.1 through 3.6.3)
-
150/5000-9A (Part 8) (PDF)
Includes Section 4, Project Management Implementation; References; and Appendices
150/5000-11 - Announcement of Availability All Cargo Carrier Activity Report (FAA Form 5100-108, Revised)
(Cancelled)
- Date cancelled
- Date issued
- 1993-03-24
- Office of Primary Responsibility
- APP-400, Office of Airport Planning & Programming, Planning & Environmental Division
- Description
- Provides guidance for the submission of the All Cargo Carrier Activity Report (revised as of March 1993).
- Content
-
This document's content is unavailable.
150/5050-3B - Announcement of Availability-Planning the State Aviation System (Cancelled)
- Date cancelled
- 2009-07-15
- Cancellation notes
- Responsible Office
- Date issued
- 1989-04-11
- Office of Primary Responsibility
- APP-400, Office of Airport Planning & Programming, Planning & Environmental Division
- Content
-
- 150/5050-3B (PDF)
150/5050-7 - Establishment of Airport Action Groups (Cancelled)
- Date cancelled
- 2011-04-18
- Cancellation notes
- AAS-100, no replacement
- Date issued
- 1987-06-23
- Office of Primary Responsibility
- AAS-300, Office of Airport Safety and Operations - Airport Safety & Operations Division
- Description
-
Provides guidance for use in accomplishing effective airport system planning.
- Content
150/5000-7 - Report No. DOT/FAA/PP/87-1 Measuring the Regional Economic Significance of Airports (Cancelled)
- Date cancelled
- Date issued
- 1987-05-12
- Office of Primary Responsibility
- APP-400, Office of Airport Planning & Programming, Planning & Environmental Division
- Content
-
This document's content is unavailable.
150/5070-6A - Airport Master Plans (Cancelled)
- Date cancelled
- 2007-05-01
- Cancelled by
- 150/5070-6B
- Date issued
- 1985-06-01
- Office of Primary Responsibility
- APP-400, Office of Airport Planning & Programming, Planning & Environmental Division
- Content
-
- 150/5070-6A (part 1) (PDF)
- 150/5070-6A (part 2) (PDF)
150/5050-4 - Citizen Participation in Airport Planning (Cancelled)
- Date cancelled
- 2019-10-28
- Cancellation notes
- 150/5050-4A
- Date issued
- 1975-09-26
- Office of Primary Responsibility
- APP-400, Office of Airport Planning & Programming, Planning & Environmental Division
- Description
-
Provides guidance for citizen involvement in airport planning. Although not mandatory for airport grant programs, it explains the need for early citizen participation.
Note: Portions of this AC are under review for update. Please contact the appropriate Regional Office or Airports District Office for assistance.
- Content
-
- AC 150/5050-4 (PDF)
150/5070-5 - Planning the Metropolitan Airport (Cancelled)
- Date cancelled
- 2009-07-15
- Cancellation notes
- Responsible Office
- Date issued
- 1970-05-22
- Office of Primary Responsibility
- APP-400, Office of Airport Planning & Programming, Planning & Environmental Division
- Description
-
Explains how to compute airport capacity and aircraft delay for airport planning and design. Reflects the increased capacity resulting from the recent change in parallel runway separation criteria, adds a procedure for calculating savings associated with a reduction in aircraft delay, and updates the capacity and delay computer program references.
- Content
150/5070-3 - Planning the Airport Industrial Park (Cancelled)
- Date cancelled
- 2009-07-15
- Cancellation notes
- Responsible Office
- Date issued
- 1965-09-30
- Office of Primary Responsibility
- APP-400, Office of Airport Planning & Programming, Planning & Environmental Division
- Content