Chapter 11. Evaluating Aeronautical Effect ▶ Section 1. General 11-1-1. EXISTING AND PROPOSED OBJECTS 11-1-2. AIRPORT TRAFFIC PATTERNS 11-1-3. INSTRUMENT FLIGHT PROCEDURES 11-1-4. AIR TRAFFIC CONTROL PROCEDURES 11-1-5. SAFETY OF PERSONS AND PROPERTY ON THE GROUND 11-1-6. NOISE CONSIDERATION 11-1-7. AERONAUTICAL ACTIVITY 11-1-8. WIND ROSE DATA 11-1-9. HELICOPTER INGRESS-EGRESS ROUTES 11-1-10. DISPLACED THRESHOLDS AND CHANGING THE RUNWAY END 11-1-11. EXISTING AIRPORTS ▶ Section 2. Processing of Airport Proposals By Regional Airports Offices 11-2-1. PROPOSALS 11-2-2. AIRPORT LAYOUT PLANS (ALP) 11-2-3. NON-PART 157 PROPOSED CONSTRUCTION OR ALTERATION ON NON-OBLIGATED PUBLIC-USE AIRPORTS 11-2-4. FAA COORDINATION 11-2-5. NEGOTIATION WITH SPONSOR 11-2-6. CIRCULARIZATION 11-2-7. EVALUATE COMMENTS AND AERONAUTICAL EFFECT 11-2-8. INFORMAL AIRSPACE MEETINGS 11-2-9. ISSUE DETERMINATION ▶ Section 3. Processing of Airport Proposals By Regional Flight Standards Offices 11-3-1. EFFECT ON SAFETY OF FLIGHT 11-3-2. EFFECT ON SAFETY OF PERSONS AND PROPERTY ON THE GROUND 11-3-3. ONSITE EVALUATIONS ▶ Section 4. Processing of Airport Proposals By Operations Support Group Flight Procedures Teams 11-4-1. EFFECT ON INSTRUMENT PROCEDURES 11-4-2. EVALUATION OF PART 77 AERONAUTICAL STUDIES 11-4-3. EVALUATION OF PART 157 AERONAUTICAL STUDIES 11-4-4. EVALUATION OF CONSTRUCTION SAFETY AND PHASING PLANS 11-4-5. EVALUATION OF AIRPORT LAYOUT PLANS (ALP) ▶ Section 5. Processing of Airport Proposals By Technical Operations Services Area Offices 11-5-1. ELECTROMAGNETIC OR LINE-OF-SIGHT INTERFERENCE 11-5-2. EVALUATION OF INSTRUMENT RUNWAY DESIGNATION 11-5-3. CHANGE IN AIRPORT STATUS FROM VFR TO IFR 11-5-4. AIRPORT PROPOSALS ▶ Section 6. Processing of Airport Proposals By Service Area Offices 11-6-1. EFFECT ON AIR TRAFFIC CONTROL OPERATIONS 11-6-2. COORDINATION 11-6-3. AIRPORT TRAFFIC PATTERNS 11-6-4. PART 77 REVIEW 11-6-5. DESIGNATION OF INSTRUMENT RUNWAY/CHANGE IN AIRPORT STATUS VFR TO IFR 11-6-6. ONSITE EVALUATION