Air Traffic Control Facility Replacement

Facilities Replaced 

In accordance with Section 624 of the FAA Reauthorization Act of 2024, the FAA will maintain and publish a list of all air traffic control tower facilities replaced within the 10-year period preceding the date of enactment of the FAA Reauthorization Act. 

Facility IDFacility NameStateFacility Type
AZOKalamazooMICombined Tower/TRACON
PBIWest Palm BeachFLCombined Tower/TRACON - tower replaced
FXEFort Lauderdale ExecutiveFLTower with Radar
ORD-SChicago O'HareILTower with Radar
CLECleveland-Hopkins TowerOHCombined Tower/TRACON
PBI TRACONWest Palm Beach TRACONFLCombined Tower/TRACON -TRACON replaced
LAS/L30Las VegasNVTower with Radar and collocated TRACON
TUSTucsonAZTower with Radar
SFOSan FranciscoCATower with Radar
SRQSarasotaFLTower with Radar
P80Portland TRACONORTRACON
CLTCharlotteNCCombined Tower/TRACON
IWAMesaAZFederal Contract Tower
GSOGreensboroNCCombined Tower/TRACON
RSWFort MyersFLCombined Tower/TRACON

Note: In addition, Teterboro ATCT in Teterboro, NJ was commissioned in October 2024, after the enactment of the FAA Reauthorization Act of 2024.

Facilities Pending Replacement

As required by Section 624(c)(2), the table below outlines the ATCT and TRACON facilities pending replacement.

Facility IDFacility NameStateFacility Type
CHSCharleston InternationalSCATCT/ TRACON
LAWLawton-Fort Sill RegionalOKFCT
PIHPocatello RegionalIDFCT
SMFSacramento InternationalCAATCT
SJCSan Jose Mineta InternationalCAATCT
GFKGrand Forks InternationalNDATCT
GSPGreenville-Spartanburg InternationalSCATCT/TRACON
TMBMiami Executive FLATCT
Last updated: Friday, May 15, 2026