150/5300-9B - Predesign, Prebid, and Preconstruction Conferences for Airport Grant Projects (Cancelled)
- Date cancelled
- 2015-09-14
- Cancellation notes
- 150/5370-12B
- Date issued
- 2009-09-30
- Office of Primary Responsibility
- AAS-100, Office of Airport Safety & Standards - Airport Engineering Division
- Description
-
Provides guidance for conducting predesign, prebid, and preconstruction conferences for projects funded under the FAA airport grant program. This version adds quality acceptance as a topic of discussion for the preconstruction conference, items to be addressed in the engineer’s report, details about what should be included in the phasing plan, and discussion of construction management plans.
The content from this AC is now included in AC 150/5370-12B.
- Content
-
- 150/5300-9B (PDF)
150/5300-9A - Predesign, Prebid, and Preconstruction Conferences for Airport Grant Projects (Cancelled)
- Date cancelled
- 2009-09-30
- Cancellation notes
- 150/5300-9B
- Date issued
- 1985-05-01
- Office of Primary Responsibility
- AAS-100, Office of Airport Safety & Standards - Airport Engineering Division
- Description
-
Provides guidance for conducting predesign, prebid, and preconstruction conferences for projects funded under the FAA airport grant program.
- Content
-
- 150/5300-9A (PDF)