Skip to page content

USA Banner

Official US Government Icon

Official websites use .gov
A .gov website belongs to an official government organization in the United States.

Secure Site Icon

Secure .gov websites use HTTPS
A lock ( ) or https:// means you’ve safely connected to the .gov website. Share sensitive information only on official, secure websites.

United States Department of Transportation United States Department of Transportation

Document Information

Results for Document Number: 150/5100-

150/5100-13C - Development of State Aviation Standards for Airport Pavement Construction

Status
Active
Date issued
2019-12-06
Office of Primary Responsibility
AAS-100, Office of Airport Safety & Standards - Airport Engineering Division
Description

This AC provides guidelines for the development of State Aviation Standards for airport pavement construction at nonprimary public-use airports as well as the use of State Highway Material Specifications for airport pavement construction at nonprimary airports.

Content

Back to Top

150/5100-17 - Land Acquisition and Relocation Assistance for Airport Improvement Program Assisted Projects (Consolidated through Change 7)

Status
Active
Date issued
2017-07-10
Office of Primary Responsibility
APP-400, Office of Airport Planning & Programming, Planning & Environmental Division
Description

Provides guidance to sponsors of airport projects developed under the Airport Improvement Program (AIP) to meet the requirements of the Uniform Relocation Assistance and Real Property Acquisition Policies Act of 1970 (PL 91-646, as amended) and the Regulations of the Office of the Secretary of Transportation, 49 CFR Part 24. Consolidated AC includes Changes 1-7.

Content
Changes
Changes
Change Title Date
1

Change 1 - Land Acquisition and Relocation Assistance for Airport Improvement Program Assisted Projects.

1996-12-20
2

Change 2 - Land Acquisition and Relocation Assistance for Airport Improvement Program Assisted Projects

1997-05-01
4

Change 4 - Land Acquisition and Relocation Assistance for Airport Improvement Program Assisted Projects

2001-09-07
6

Land Acquisition and Relocation Assistance for Airport Improvement Program (AIP) Assisted Projects

Incorporates the updates to implementing Federal regulations 49 CFR Part 24, and all prior changes to the AC, number 1 through 5.

2005-11-07

Back to Top

150/5100-21 - State Block Grant Program

Status
Active
Date issued
2016-10-31
Office of Primary Responsibility
APP-520, Airport Improvement Program Branch
Description

This AC provides guidance for application to and implementation of the State Block Grant Program (SBGP). It is intended for states and airport sponsors who participate, or plan to participate, in the SBGP.

Content

Back to Top

150/5100-20 - Guidance on the Extraction of Oil and Gas on Federally Obligated Airports

Status
Active
Date issued
2016-03-23
Office of Primary Responsibility
APP-400, Office of Airport Planning & Programming, Planning & Environmental Division
Description

This AC discusses oil and gas development on federally obligated airport land, including any drilling that penetrates the subsurface of airport owned land. It describes how existing FAA policy, guidance, standards and obligations, as well as other applicable laws and regulations, apply to proposed oil and gas extraction from obligated airports (both use of surface land and extraction of subsurface minerals/oil/gas). It does not create new requirements for on-airport or nearby off-airport land use or development. The AC was produced as a joint effort by the FAA’s Offices of Airport Planning and Programming, Airport Safety and Standards, and Airport Compliance and Management Analysis.

Content

Back to Top

150/5100-14E - Architectural, Engineering, and Planning Consultant Services for Airport Grant Projects

Status
Active
Date issued
2014-09-30
Office of Primary Responsibility
AAS-100, Office of Airport Safety & Standards - Airport Engineering Division
Description

This AC provides guidance for airport sponsors in the selection and engagement of architectural, engineering, and planning consultants. It also discusses services that normally would be included in an airport grant project, types of contracts for these services, contract format and provisions, and guidelines for determining the reasonableness of consultant fees. Please see the Principal Changes paragraph for a list of major changes from the last version of this AC.

Content
Changes
Changes
Change Title Date
1

Change 1 to AC 150/5100-14E

2015-09-25

Back to Top

150/5100-19D - Guide for Airport Financial Reports Filed by Airport Sponsors

Status
Active
Date issued
2011-06-23
Office of Primary Responsibility
ACO-100, Airport Compliance and Management Analysis, Airport Compliance Division
Description

Provides airport sponsors with guidance on filing FAA Form 5100-126, Financial Governmental Payment Report, and FAA Form 5100-127, Operating and Financial Summary. Announces changes to the FAA's financial reporting program and to Form 5100-127.

See also Airport Financial Reporting Program.

Content

Back to Top

150/5100-13B - Development of State Standards for Nonprimary Airports (Cancelled)

Date cancelled
2019-12-06
Cancellation notes
150/5100-13C
Date issued
2011-08-31
Office of Primary Responsibility
AAS-100, Office of Airport Safety & Standards - Airport Engineering Division
Description

Provides guidelines for the development of State standards for and the use of State highway specifications for pavement construction at nonprimary public-use airports as provided for in title 49 United States Code (USC), Sections 47105(c) and 47114(d)(5), respectively.

Content

Back to Top

150/5100-14D - Architectural, Engineering, and Planning Consultant Services for Airport Grant Projects (Cancelled)

Date cancelled
2014-09-30
Cancellation notes
150/5100-14E
Date issued
2005-09-30
Office of Primary Responsibility
AAS-100, Office of Airport Safety & Standards - Airport Engineering Division
Description

Provides guidance for airport sponsors in the selection and employment of architectural, engineering, and planning consultants under Federal Aviation Administration airport grant programs.

Content

Back to Top

150/5100-19C - Guide for Airport Financial Reports Filed by Airport Sponsors (Cancelled)

Date cancelled
2011-06-23
Cancellation notes
150/5100-19D
Date issued
2004-04-19
Office of Primary Responsibility
ACO-100, Airport Compliance and Management Analysis, Airport Compliance Division
Description

Provides airport sponsors with guidance for complying with the airport financial reporting requirements.

Content

Back to Top

150/5100-19B - Guide for Airport Financial Reports Filed by Airport Sponsors (Cancelled)

Date cancelled
2004-04-19
Cancellation notes
150/5100-19C
Date issued
2001-04-20
Office of Primary Responsibility
ACO-100, Airport Compliance and Management Analysis, Airport Compliance Division
Content
Changes
Changes
Change Title Date
2

Change 2 - Guide For Airport Financial Reports Filed By Airport Sponsors

2003-01-15

Back to Top

150/5100-13A - Development of State Standards for Non-Primary Airports (Cancelled)

Date cancelled
2011-08-31
Cancellation notes
AC 150/5100-13B
Date issued
1999-09-28
Office of Primary Responsibility
AAS-100, Office of Airport Safety & Standards - Airport Engineering Division
Description

Provides guidelines for the development of state standards for non-primary public-use airports as provided for in Title 49, U.S. Code, Section 47105(c).

Content
Cancels
Cancels
Number Title Date
150/5100-13 Development of State Standards for General Aviation Airports Provides guidelines and programming procedures for the development of state standards for general aviation airports as provided for in the Airport and Airway Development Act Amendments of 1976. 1977-03-01

Back to Top

150/5100-18 - Guide for Audit Certification by Airport Sponsors (Cancelled)

Date cancelled
2000-03-01
Cancellation notes
OMB Circular A-133
Date issued
1998-08-31
Office of Primary Responsibility
ACO-100, Airport Compliance and Management Analysis, Airport Compliance Division
Description
Superseded and replaced by OMB Circular A-133, Audits of States, Local Governments, and Non-Profit Organizations, revised June 24, 1997, and by the OMB Circular A-133, Compliance Supplement for the Department of Transportation, dated on or after March 2000.
Content

This document's content is unavailable.

Back to Top

150/5100-14C - Architectural, Engineering, and Planning Consultant Services for Airport Grant Projects (Cancelled)

Date cancelled
2005-09-30
Cancellation notes
150/5100-14D
Date issued
1994-02-16
Office of Primary Responsibility
AAS-200
Content

This document's content is unavailable.

Back to Top

150/5100-15A - Civil Rights Requirements For The Airport Improvement Program (AIP) (Cancelled)

Date cancelled
2012-03-05
Cancellation notes
APP-500
Date issued
1989-03-31
Description

Encompasses the basic civil rights requirements for the Airport Improvement Program (AIP). The AC is intended for sponsors using program assistance and for contractors and subcontractors working on projects under the program.

This AC is superseded by 49 Code of Federal Regulations Part 23 (Airport Concessions) and Part 26 (Federally Assisted Contracts).

Content

Back to Top

150/5100-16A - Airport Improvement Program Grant Assurance Number One -- General Federal Requirements (Cancelled)

Date cancelled
Date issued
1988-10-04
Office of Primary Responsibility
APP-510, Office of Planning & Programming, Financial Analysis & Passenger Facility Charge Branch
Content

This document's content is unavailable.

Back to Top

150/5100-6D - Labor Requirements for the Airport Improvement Program (AIP) (Cancelled)

Date cancelled
2012-03-05
Cancellation notes
APP-500
Date issued
1986-10-15
Description

Encompasses the basic labor and associated requirements for the airport grant program. It is intended for sponsors using program assistance and for contractors and subcontractors working on projects under the program.

This AC is superseded by more current AIP labor requirements found in 49 Code of Federal Regulatios Part 18.36 (Procurement).

Content

Back to Top

150/5100-13 - Development of State Standards for General Aviation Airports (Cancelled)

Date cancelled
1999-09-28
Cancelled by
150/5100-13A
Date issued
1977-03-01
Office of Primary Responsibility
AAS-100, Office of Airport Safety & Standards - Airport Engineering Division
Description
Provides guidelines and programming procedures for the development of state standards for general aviation airports as provided for in the Airport and Airway Development Act Amendments of 1976.
Content

This document's content is unavailable.

Back to Top

150/5100-10A - Accounting Records Guide for Airport Aid Program Sponsors (Cancelled)

Date cancelled
2012-03-05
Cancellation notes
Order 5100.38
Date issued
1976-04-13
Office of Primary Responsibility
APP-500, Office of Planning and Programming
Description

Sets forth recordkeeping requirements imposed on sponsor of Airport Development Aid Program (ADAP) and Planning Grant Program (PGP) projects funded by the Airport and Airway Development Act of 1970, as amended. In addition, Federal regulations require a sponsor to establish and maintain a financial management system that meets the standards set forth in Part 152, Appendix K. This circular provides detailed explanations of these requirements.

This AC is superseded by more recent accounting and record-keeping requirements found in the current version of FAA Order 5100.38, Airport Improvement Program Handbook.

Content

Back to Top