AIP Development Projects: Engineering/Design/Construction
Central Regional Airports Division
On this Page …
Guidance
Consultant Selection
- Advisory Circulars
- AC 150/5100-14 — Architectural, Engineering and Planning Consultant Services for Airport Grant Projects
- AIP Sponsor Guide — Supplemental Guidance for Central Region
- Section 300 (PDF) — Procurement of Professional Services
Design
- Overview of Engineering and Design
- Advisory Circulars
- AC 150/5300-13 — Airport Design
- AC 150/5320-5 — Surface Drainage Design
- AC 150/5320-6 — Airport Pavement Design and Evaluation
- AC 150/5340-1 — Standards for Marking Airfield Pavements
- AC 150/5340-30 — Design & Installation of Visual Aids
- AC 150/5370-10 — Standards for Specifying Construction
- AIP Sponsor Guide — Supplemental Guidance for Central Region
- Section 900 (PDF) — Project Design: Development Projects
- Airport Engineering and Design Standards — Standards Cross Reference
- Design Applications
- COMFAA 3.0 — Supplement to AC 150/5335-5, Standardized Method of Reporting Airport Pavement Strength — PCN
- FAARFIELD 1.305 — Supplement to AC150, 5320-6, Airport Pavement Design and Evaluation
- PAVEAIR - Pavement Management System Application for compliance with AC 150/5380-7
- Payment Adjustments Applications
- Engineering Briefs — Supplemental Engineering Guidance
- Modification of Construction Standards
- Central Region Modifications to AC 150/5370-10 (MS Word) — February 10, 2015
Construction
- Advisory Circulars
- AC 150/5300-9 — Predesign, Prebid and Preconstruction Conferences for Airport Grant Projects
- AC 150/5370-2 — Operational Safety on Airports During Construction
- AC 150/5370-10 — Standards for Specifying Construction
- AC 150/5370-12 — Quality Control of Construction for Airport Grant Projects
- AIP Sponsor Guide — Supplemental Guidance for Central Region
- Section 1000 (PDF) — Construction: Development Projects
- Forms
- Construction Progress and Inspection Report — FAA Form 5370-1
- Davis Bacon Posted Notice — DOL Website
- Davis Bacon Wage Rate Determinations — DOL's Wage Determinations On-Line
- EEO Posted Notice — DOL Website
- Labor Standards Interview SF-1445 — GSA Form
Research
Innovative Pavement Research Foundation (IPRF)
- Reports
- Airfield Marking Handbook: 01-G-002-05-01 (PDF) — Best practices for application of pavement markings on airfields
- Constructing In-Pavement Lighting, Portland Cement Concrete Pavement: 01-G-002-03-01 (PDF)- Suggested practices for improved performance of In-pavement light fixtures in PCC pavement
- Using Maturity Testing for Airfield Concrete Pavement Construction and Repair: 01-G-002-03-06 (PDF) — Benefits of using concrete maturity testing for PCC pavement construction
- Stabilized and Drainable Base in Rigid Pavement Systems: 01-G-002-02-01 (PDF) — Design and construction procedures for the use of stabilized and permeable materials as a base for rigid pavements
- Best Practices for Airport Portland Cement Concrete Pavement Construction: 01-G-002-1 (PDF) — Suggested design and construction practices for long term performance of airfield pavement
Last updated: Tuesday, August 2, 2022